Snake Pit – Back and Open for Business

A few weeks ago, YHC was asked to Q at the Snake Pit.  The timing of dates was ironic given that  YHC was lucky enough to have the Q spot at the launch last October.   So the re-opening was set and PAX showed to support an accelerating site.

YHC chalked out the weinke the day before but mother nature washed it out overnight.  Thankfully an early arrival allowed time to re-chalk the “fun” PAX would have early that morning.

16 #HIM arrived ready to go with copious amounts of mumble chatter – something YHC sorely missed.  It was great to be back out in the gloom and at familiar sites.   After disclaimers were given, confirmation took place that no FNG’s were present (there were not) and the 5 core principles of F3 workouts were announced, off we moseyed without the bells.  Here’s what followed:

Mosey down the hill to the bus loop.  Upon arrival PAX began to circle until a JWOW sighting took place.  Fashionably late, he picked up the pace to join us and was met half way back up the hill.  We circled (or ovaled) up for the following IC:

Imperial Walkers x 15, 6 burpees OYO, Hillbilly Walkers X 15, 5 burpees OYO, Low slow squats x 12 with a hold to the people’s chair on the 12th rep.  While in the people’s chair, PAX completed the following IC:  10 Moroccan Night clubs, 10  shoulder taps, 10 air presses.  Legs were good and warm for what was to follow.  We moseyed back up the hill to our kettle bells and saunterd off to the base of the parking lot hill for a Partner Pyramid.  The pyramid was launched on the football field at the launch of the Snake Pit.  It seemed appropriate to bring it back out for the re-launch.  So we did.

Main Event:  Everyone was able to partner up evenly and began working up the pyramid then back down.  Exercises were 10, 10-20, 10-20-30, 10-20-30-40, 10-20-30-40-50, 50-40-30-20-10, 40-30-20-10, 30-20-10, 20-10, 10.  10 – goblet squats, 20 – hammer curls, 30 – tricep extensions, 40 – American hammers with the bell, 50 – kettle bell swings.  Partners alternated between working the pyramid and doing a 100 (ish) yard shuttle run to the top of the hill into the fire lane where work awaited arriving PAX before returning down the hill.  Partner 1 ran to the fire lane at the top of hill and did 10 burpees on trip one before coming back down to pick up where partner 2 left off on the pyramid, trip 2 was run, 10 hand release merkins, return. Trip 3 was run, 10 squats, return. Trip 4 was run, 10 diamond merkins, return.  Back to run, 10 burpees, return for trip 5 and so on.

PAX finished up the pyramid by moving to Al Gore as the 6 came in.  From there, we moseyed with the bells at 0557 to COT.  Time for an ab exercise or two until 0600 was upon us.

Flutters with the press x 15 plus a 30 second body destroyer to soak in the humidity was all time would allow.

Announcements were made for the 7-11 convergence as well as the discussion on race relations being held this Saturday, 6-13 at the Amphitheatre in Kingsley.  Prayers and praises were offered up for Polaroid’s daughter, for Cash, for YHC’s Dad and for 3D’s M.

NMM – Proximity matters.  If there’s one thing YHC has missed (and I suspect others have as well) during this pandemic, it’s the ability to look another PAX in the eye and to push one another to improvements we would likely never attain on our own.  Get proximate.  Engage with a shield lock and the accountability drives you to a much better place than without it.  Thank you, brothers.  And to 3D for the opportunity to Q again and re-launch the Snake Pit.

It was a honor to post with all of you.

Until next time:

Cyclops

 

 

TClap |
0

APFT at Golden Corral, version 1 of 6

2nd Tuesdays of the month at GC will be the APFT and we’ll track progress.

Mosey to Lake Wylie Brewing for 10 windmills, 20 imperial walkers, 10 low slow squats.  2 mins AMRAP merkins for count, 2 mins AMRAP big boy sit ups for count, and timed 2 mile run.

Points are awarded for count/time bracketed by age group.

PAX, # of reps/time (scores), then total points/ave points
Maximus, 71 merkins (98), 66 bbsu (89), 13:04 (100) = 287/95.7
Gears, 59 merkins (92), 61 bbsu (89), 14:15 (99) = 280/93.3
Dark Helmet, 74 merkins (100), 62 bbsu (90), 15:17 (90) = 280/93.3
Long Duck, 75 merkins (100), 37 bbsu (69), 15:59 (91) = 260/86.7
Change Order, 61 merkins (94), 54 bbsu (86), 16:48 (77) = 257/85.7
BOT, 73 merkins (98), 54 bbsu (74), 15:17 (83) = 255/85
Olaf, 62 merkins (87), 50 bbsu (69), 14:17 (92) = 248/82.7
Body Wash, 67 merkins (94), 32 bbsu (54), 15:31 (84) = 232/77.3
Grout, 44 merkins (76), 38 bbsu (66), 16:41 (78) = 220/73.3
Lutefisk, 52 merkins (76), 50 bbsu (69), 17:29 (63) = 208/69.3

It’ll be interesting to see the progress, we’ll be doing this 5 more times so don’t be afraid to start in July!

TClap |
10

Negative Splits

23 was the number to launch The Fort’s newest AO: Sweep The Leg.  The goal of any AO should be acceleration of overall fitness of the Pax, and I believe we delivered this morning.

The workout was simple.  3 miles, half mile segments with pain stations.  The goal was negative splits with 3 minute pain stations between segments.  Something like the following:

  • .5 miles at 8:15 pace, 3 min pain station
  • .5 miles at 8:00 pace, 3 min pain station
  • .5 miles at 7:45 pace, 3 min pain station
  • .5 miles at 7:30 pace, 3 min pain station
  • .5 miles at 7:15 pace, 3 min pain station
  • .5 miles at 7:00 pace, 3 min pain station

Pain stations included crowd favorites such as:

  • Burpees
  • Bombjacks
  • Squats
  • Hillybilly Squats
  • Flutter
  • Freddy Mercury’s
  • Merkins
  • Mountain Climbers
  • Peter Parker
  • Parker Peter
  • Monkey Humpers

The leaders of the pack did the full pain station, those bringing up the six may or may not get to do the exercises at the pain station, but it kept the pax mostly together and pushed guys to keep up since the overall pace continued to speed up.

Hit this link for the route and some deets.

The #Kings this week were Pointer, Maximus, and Shady, who will be added to the Q list for an upcoming workout.

Ready your newsletter and pray for our country and the unrest going on right now due to racial injustice.

Honor to Serve.

TClap |
23

Dropkicked at The Rock

BAOPS. It’s an acronym  that Trucker has been pushing, almost devoting himself to, with regard to the AO, Alcatraz, he now oversees. If you’ve been living under a rock for the last several weeks, let me enlighten you on Tega Cay’s own “Rock.”

Rather than being on its own island, our version of Alcatraz is almost at the end of a peninsula. Rather than water with treacherous currents, our version has streets with treacherous hills.
Just as you have to plan some extra time to get to THAT Alcatraz, you also have to plan some extra drive time to get to our version of Alcatraz…it’s way down TC Drive.

When Alcatraz Federal Penitentiary was in operation, it housed the hardest, most notorious criminals of its day. In Trucker’s verbiage, BAOPS stands for the “Baddest Area of Operations (AO) for Pain on Saturday.” Consistent with the last several weeks, some of the most hard-charging PAX from The Fort & Rock Hill (The Rock-how fitting) posted at Alcatraz this morning. Some even thought they rolled up on a convergence when they drove in with all the cars.

21 PAX (welcome Suplex) joined Router & YHC for a total of 23 to embark on a twist of a workout this morning. It’s been a minute since we’ve had Router post with us but consistent with our memory, he was prepared to bring it. After we were disclaimed and he shared with us his plan to put us through some conditioning (as part of the strength & conditioning workout), we took off for a warm-up mosey, ultimately leading us to the top of “the hill” on the back side of the park. This time however, we’d be going the other direction.
So here’s the deal, we’re running segments, of which there are 3. Segment 1, you’re running to your “pukey” limit. You know what that is; the place you get to where you’re about to splash. Yeah, get in that zone. Run it to the stop sign just past the Firehouse and do a recovery run back to the start. Then pukey-limit run to the stop sign and run to what amounts to the trail entrance just past the COT parking lot and recovery run the remaining trek back to the start. Now, pukey run that whole thing. Oh no, then….do a few more of those segments again but honestly, this is where the wheels started to come off as the PAX spread out and nobody was exactly sure what to do next . So, some ran more, some did some mary and some picked up the six. Yup, just as planned.
Then…oh dear Lord, this is where we take it to the next phase and you think your heart is going to pop out of your eye socket. Router takes us to the bottom of the hill, yes that hill. He explains his plan for 30/60/90. Fortunately, we never made it to 90 but nevertheless, when he says GO, we’re to take off up the hill, running for 30 seconds until he says stop. Yeah, that was tough but he made us go back down the hill to do the 60. Run up the hill and keep running for 60 seconds. Now that was B-RUTAL. Fortunately it was now 0701 and it was time to hand off to Maximus for the strength portion of the strength & conditioning.

With Max on Q, we would slow mosey (oh, thank you) back to the parking lot, pull a Switzer at one end and drop to a plank (ala Honey Badger). Next up, a nod to a USMC Serviceman named Cpl Albert (Bert) Gettings, 27, of New Castle, PA. Yup, we’re doing a modified BERT. If you’ve never done the real Bert, go give it a run and recap it to me afterward. Cpl. Albert Gettings was killed in action Jan 5, 2009 while conducting counter-sniper operations in Fallujah, Iraq. He was serving as a team leader with the 2nd Battalion, 6th Marine Regiment, 2nd Marine Division, II Marine Expeditionary Force out of Camp Lejeune, NC.

HERE WE GO!!!
25 Burpees
50m Bear Crawl to the other end of the parking lot
50 Hand-Release Merkins
50m Bear Crawl
80 Walking lunges
Bear Crawl back
50 Squats
50m Bear Crawl
80 Carolina Dry Docks
50m Bear Crawl
Mary til the six is in

In closing, please do yourself a favor, push yourself to do something more challenging than what you thought you were capable of. Not just in the 1st F although that is a great start, but in the 2nd & 3rd, too. This world needs it now and frankly, you’ve been built and called for this. Do not be a wallflower.

Announcements: Gears starting a new hard-hitting AO this Monday, 6/1. Classroom Ready partnership oppty coming soon from Bonsai, Q-Source is for everyone, AO’s opening back up week of 6/8, big ‘ol convergence 7/11 and several other announcements.

Prayer Request: PAX going through job/life transitions. Our country always but especially now with community tensions. Health of family/friends.

SYITG
Router & Maximus

TClap |
5

World Domination Complete – The Hive comes to Saturdays at a socially distant location near you…

Well it was bound to happen and eventually it did, The Hive crossed over the last day of the week not yet occupied by The Hive…  Spitz led the first half and Tesh closed strong on an absolutely beautiful day in The Fort.  We are blessed to be in this great town and I am blessed to have the brothers of F3 here in Fort Mill coming out and supporting this AO.  We will soon be back to the new form of normal and I will definitely be ready to stop using Worship Planner…

IMG_0839

 

TClap |
2

Rebel Base Armory – May the Fourth Be With You – Final Monday Hive…

It was a pretty amazing month of April, but I was so ready to have JWOW back running The Armory.  Most favored spot at the corner was reserved for the proper shovel flag, but I was proud to fly The Hive’s flag on Mondays.

The Hive – May the Fourth

The Weinke is attached.  It was brutal.  Much harder than I thought it would be…

Thank you JWOW for allowing The Hive to occupy your spot for the month of April our year of COVID 2020…

 

IMG_0822

TClap |
0

Armory 5.11.2020

YHC was excited to lead on a cool, crisp morning. Was given the pass by the M to post after an 0200 feeding, so needless to say sleep was not an abundant resource leading up to this. 

Many familiar faces were seen prior to start – notables being Wegmans, Repeat, and Sugar Daddy (who brought an FNG!). Though chilly, the gloom was warm and fuzzy at the start of this beat down.

0515 struck. Disclaimer. Go time. 

Mosey out to far end of lot, drop bells on one end of the lot
Grab every other parking spot

COP
5 Burpees OYO
11xSSH
Mosey to next row of spots
11xLow Slow Squat
Mosey to next row
11xTappy Taps
Mosey to next row 
11xMerkins
Mosey to next row 
11xMoroccan Night Clubs
Mosey back to Bells
5 Burpees OYO

WEINKE
Five Rows of Spots
11 Reps Each Stop

Method of Travel
Lunge walk to each row

Row 1
Halos
Kid Launch

Row 2
One Legged RDL both sides

Row 3
Tricep Extensions
Curls

Row 4
Goblet Squats
Cossack Squats

Row 5
Burpee Snatch

OH carry back to start, Rinse & Repeat

We completed two rounds and headed back to COT for some Mary

Mary
Kettlebell Core Work
American Hammers x 20
In & Outs x 10
Flutters w/press x 20
Hello Dolly w/extended hold x 10
Six Inch Hold w/Bell x 1 min
Low Plank Hold x 1 min
WWI Sit Ups x 10

Rounded out with 8 burpees per PAX to reach 40/ea. 

NMM

While holding our low plank YHC talked about anxiety and hurry and how we as men aren’t made to have larger to do lists than we can handle. We aren’t made to be busier than life itself – even though it is touted as a sign of success in today’s hustle world. YHC mentioned Gods peace and how we should each take a moment today to let ourselves feel Gods presence and shut everything else off. A few verses were discussed. The second was spoken to the group but the first is also tantamount to the message.

“Peace I leave with you; my peace I give you. I do not give to you as the world gives. Do not let your hearts be troubled and do not be afraid.”
‭‭John‬ ‭14:27‬ ‭

“Do not be anxious about anything, but in everything, by prayer and petition, with thanksgiving, present your requests to God. And the peace of God, which transcends all understanding, will guard your hearts and your minds in Christ Jesus.”

Philippians 4:6-7

Prayers/Praises

Baby Wegmans is 2 months! Pray Wegs & M can keep him alive further.

YHC’s 2.3 is putting on weight and feeding better this week due to lactation strategy and bottle feedings.

UHAUL is going to satisfy all of his M’s desires via Honey Do List (#HIM) this week. 

Announcements

Alcatraz is BACK! Follow up on Slack for more details.

 

Thanks JWOWW for the tap to lead. Excited to get back into the swing of things and see more of my brothers in the gloom. Welcome FNG Scalp!

Punch List out. 

TClap |
4

The Thrill Is Back – At The Hive

It’s been a wild and weird year this year hasn’t it?  I took a break from in person workouts until I got used to this new normal and last year I decided to just go for it and start posting again in person.

UHaul thought it would be a good idea to let me Q again, I guess.  I’m just making up stuff at this point but here’s the real workout.

I call it Double Trouble.

One exercise with the bells, one body weight or with the bell if you feel spunky.

Round 1, 10 each exercise, Round 2 15 and Round 3 25 each of the following:

Swings
Turkish getups

Goblet squats
Flutters

Curls
Merkins

Tricep extensions
Squats

Sumo squat
LBC

Skull crusher
Rosa Lita

Dead lifts
Calf raises

Lawnmowers
American hammers

One arm dead lift
Moroccan night club

Between Round 1 & 2 we ran a bit to the church and back.

Thanks again for the opportunity to lead UHaul.  It’s good to be back out in the gloom.

The mission of F3 is to plant, grow and serve small workout groups for the invigoration of male community leadership.  

TClap |
0

Bright Colors for #F3forFaye

Yesterday Spiderman & YHC had the realization that we were Qing at the same site today…I had the Golden Corral bootcamp which means he had the Fire Ant Ruck beat down. It’s always good to shake things up so we decided to do just that for this mornings edition.

As can be the case with our own lives, we sometimes over-complicate a workout and stray from the simple but effective model. I’ll go ahead and cut to the chase, I think this was certainly effective but it overshot simple pretty quickly. But hey, we were just looking to give the other 17 PAX that joined us an opportunity to chatter at our expense.

Enough rambling, here it is. We combined Ruckers & Boot Campers (wait, you can’t do that…oh yes we can) and split the combined group in half. We had 4 corners established covering most of the parking lot (corner of Harris Teeter to Red Bowl to the insurance office to the dog wash place). It was a large square-ish figure. Half went with Spider Man and half came with me.

Each corner had a sheet with exercises written on it but here’s the kicker, don’t just jog from one corner to another. Get on it. The ground is wet but “well lit” so you do you but GET IT.
For those present, you can remember all the fond times you had of poking the Q’s about how “things look better on paper” or “I bet these seemed easier in your head” or any number of other completely appropriate jabs that were thrown while trying to figure out the Ruck logistics but none of that matters ’cause you loved it and this is peer led (remember…we’re not professionals).

Corner 1 (with Rucks):
(5) 8-count Body Builders
(10) Squats
(15) Bent over rows

When your group is done, sprint

Corner 2 (w/o rucks):
(5) 8-count Body Builders
(10) Box Cutters
(15) Diamond Merkins
(20) Butt Kickers

When your group is done, sprint

Corner 3 (with Rucks):
(5) 8-count Body Builders
(10) Squats
(15) Bent over rows

When your group is done, sprint

Corner 4 (with Rucks):
(5) 8-count Body Builders
(10) Heels to Heavan
(15) Hand-Release Merkins
(20) Butt Kickers

Sprint back to Corner 1.

We did this full evolution about 3 times then brought the group back together for something we unknowingly stole from Tinsel (plagiarism is the finest form  of flattery, right?).
1 Merkin : 4 Shoulder Taps and we made it to 8:32 before having to cut it short for COT.

Important to remember today why we wore the bright colors. Remembering a little girl, Faye, whose life was too short but her impact will be far-reaching; to families and communities her or her family never knew.

Announcements: In the words of the eloquent Mainframe, “Read your da*n NEWSLETTER.” Hey, he’s right.

Prayers: Family members in battles for their lives. Communication in marriages. Cash’s recovery. Kids healing from broken bones.

Until Next Time.
Spiderman & Maximus

TClap |
5