7 of Diamonds

There were 3 runners and 9 PAX joined YHC for the boot camp portion.  Was thankful for the help as this was my VQ for a boot camp.  Wanted to make it memorable…

After a quick reminder, gave the disclaimer and we were off.


Warm Up

Moseyed toward the back of the school stopping at first parking lot for Moroccan night clubs (x15) and merkins (x10).  Then moseyed past the back of the school to the next lot where we did low slow squats (x15) and mountain climbers (x10).

The Thang

As we headed up toward the field the PAX saw the chalk on the ground with the 7 of diamonds exercises laid out…I explained each exercise is done at the four locations I pointed out around the loop that goes around the field – about 1/3 mile loop.  All exercises were oyo.  Then it was time to get to it.  Gears was out the gate first and the rest eventually joined in on the fun.  The exercises were:

Burpees (7, 28 total)

LBCs (14, 56 total)

Lunges (21, 82 total)

Flutters (28, 112 total)

Jump Squats (21, 82 total)

Diamond merkins (14, 56 total)

Burpees (7, 28 total)

 

Only a couple made it all the way through and after the six was in we had about 2 min left.  Found a curb and did 30 dips (IC) and 10ish LBCs with a very irregular counting cadence.
Headed back to the shovel flag for COT.
Thanks 38 Special for the opportunity to lead.

 

 

TClap |
3

Death by Nur and a visit by Dora, Jack Webb & Dan Taylor

Thank you to the 16 other PAX who showed up to Alcatraz on this beautiful gloom to share in some great fellowship and a little fitness. It was an awesome time and if you miss it, well, you missed out. Thank you to Trucker for allowing Longshanks and YHC to lead this morning.

WARMUP

We began the morning led by Longshanks with the 10-Bombjacks because Dark Helmet said something that was on the verge of crossing the line, although it was before the workout. Then we took a short mosey down to Anchorage Lane.

THE THANG

Once we arrived at the bottom of the hill of Anchorage Lane Longshanks told us the plan. We were going to Partner up. Partner 1 was to Nur up the hill and run back down while Partner 2 performed exercises in a modified Dora. Then flapjack. The exercises at the bottom of the hill were: 100-Dbl. Count Lunges, 200-Squats, 250=-Calf Raises, 200-Monkey Humpers, and 100-Burpees.

This took us to a little after 0700 and Longshanks handed it off to YHC.

Since Longshanks had mentioned to YHC he was going heavy on legs and burpees, I figured I would add in a little upper body and . . . legs & Burpees. We took a short mosey to the baseball field. YHC asked the PAX to line up in 4 columns and we commenced to begin a combination of Jack Webbs and Dan Taylors (alternating between the two) from a ratio of 1:4 to 10:40.

Then we lined up at the edge of the field. We then did 7’s with Burpees and Bombjacks to finish off the 30 minutes.

Once we arrived at the COT Gears led in a quick session of Dying Cockroaches to complete the hour. This morning was full of mumblechatter and fun. What you want to have at any F3 Workout.

NMM

Our Nation and world have been rocked recently with multiple crises. Coronavirus took over in late March and we are still dealing with the effects. We have seen cities, towns and communities torn apart as racial tensions have risen. Our public figures are constantly attacking each other for their ‘inabilities’ just to either gain or keep power. It seems as if we are coming apart at the seams. All of these and many more can cause stress in everyone’s lives and we are all affected.

The question and challenge I have for you today is who or where do you turn to for peace. Not a peace like the end of war peace or happiness. This term is thrown around way too much to where people just don’t understand the true meaning of it. This peace can be easily lost.

I am talking about the inner belief that you are truly at peace with yourself, the world around you, and SkyQ. For me this is a peace that you can only achieve through the blood of Jesus Christ. With this peace you are able to face the world that seems to be crumbling around us and not be shaken. Because this peace is given to us by God through his son and strengthened each day through the Holy Spirit. Seek this peace and if you don’t have it, feel free to discuss it with YHC and I will share with you.

I challenge all PAX to seek that peace, whatever it may mean to you so when tribulation comes, as it has, you will not be shaken. Seek a peach that can overcome the evil of this world and keep your keel straight.

John 16:33 ‘I have said these things to you, that in me you may have peace. In the world you will have tribulation. But take heart; I have overcome the world.’

Aye!

ANNOUNCEMENTS

Reach out to a Site Q to Q a Workout.

Sign up to serve at Bethel Men’s Shelter. https://www.signupgenius.com/go/30e0444adaa23a2fa7-bethel

The Sweati – Sat., Aug. 15 at 0600 – Start at Colosseum

Meals on Wheels – Contact Change Order

FM Care Center Lawn Care

Read your Newsletter.

PRAYERS/PRAISES

The PAX shared their prayers and praises and Longshanks lifted them up.

TClap |
2

RPG-Varsity July Combo

Twenty three PAX converged at NaFo for the RPG-Varsity Combo (July 2020 edition).  Meteorological note: there was actually an occasional breeze blowing!

Started promptly at 0515 with Sasquatch leading the Broga portion.

Sasquatch leading us in some Broga

The peaceful warrior  pose was shattered by the breaking of wind by some Pax.

Next, the pax had their choice of what to do from 0530 to COT/0600:

Boot camp: Kaiser on Q

Pax did:  Stage 1 = bench workouts including derkins, dips, incline merkins.
Stage 2 = bear crawl around circle.
Stage 3 = broad jumps across parking lot mixed in with burpees.
Stage 4 = cinderblock curls and step ups on bench
Stage 5 = flutters/ab workout to wait for the six
Stage 6 = 10 pull ups 10 chin ups 10 reverse grip pull ups 3 burpees pull ups with wall sit between intervals
Stage 7 = short Mary with Freddie mercuries and hello dolly.

Run: Harry Carry on Q
Four pax ran a 3 mile loop at about a 8:10 pace.

run route

Ruck: Cake Boss on Q
Seven pax for the ruck, covering about 1.5 miles.  Topic: Matthew chapter 24 “Be ready”.

Fini, COT

Kaiser noted James 1:19; “…be quick to listen, slow to speak and slow to become angry.”   It can be a struggle to those in the right order.

Prayers for Cash.

TClap |
9

Lead, Then Get Out of the Way

A month ago Lutefisk reached out for me to Q today and I said yes.  Thinking to myself, that will give me plenty of time to get my sorry butt somewhat back in shape.  Well, that didn’t happen so had to figure out how to lead, without leading.   Thus U vs U was my only option.
Disclaimer
FNG Alex (Soft Tail)
Mosey to Domino’s
    Mtn Climbers (10), Carolina Dry Docks (10), Hello Dollies (10), Lunges (10)
Mosey to Dogtopia
    Side Straddle Hops (54 of course), Merkins (10), LBC’s (10), Squats (10)
Mosey to back of Dollar Tree
    Peter Parkers (10), Plank Punches (10), Freddie Mercuries (10), Monkey Humpers (10)
Mosey to Express Lube wall
    Parker Peters (10), Dips (10), Box Cutters (10), Step-Ups (10-each leg)
Mosey to Walgreen’s Drive Through – Now the U vs U part
    Run Lap around Building(s) –  10 Merkins
    Run Lap around Building(s) –  10 Merkins, 10- Carolina Dry Docks
    Run Lap around Building(s) –  10 Merkins, 10- Carolina Dry Docks, 10 Wide Arm Merkins
    Run Lap around Building(s) –  10 Merkins, 10- Carolina Dry Docks, 10 Wide Arm Merkins, 10 Diamond Merkins
    Run Lap around Building(s) –  10 Merkins, 10- Carolina Dry Docks, 10 Wide Arm Merkins, 10 Diamond Merkins, 10 Hand Release Merkins
    Some folks did an extra lap (because they can)
Round Two
    Run Lap around Building(s) –  10 Bomb Jacks
    Run Lap around Building(s) –  10 Bomb Jacks, 10- Side Straddle Hops
    Run Lap around Building(s) –  10 Bomb Jacks, 10- Side Straddle Hops, 10 Burpees
    Run Lap around Building(s) –  10 Bomb Jacks, 10- Side Straddle Hops, 10 Burpees, 10 Mountain Climbers ( I think this is as far as anyone got)
    Was an option to substitute Ab exercises but in true F3 fashion peer pressure prevented any of that non-sense.
Always honored and humbled to Q.  Was great to see a lot of faces, haven’t seen in while.  Appreciate the Lake Wylie boys getting up soooo early to make the trek across the pond, but stop your moaning already (Witch Hunt).
Pax: Bones, Witch Hunt, O’Reilly, Royal, Wild Thing, Slap shot, Oscar the grouch, Tesla, Long Duck, Olaf, Shop Vac, Nature boy, Cha Ching, Change Order, Fish Sticks, Duck Dynasty, Stang, Grass Knoll, Lutefisk, White Lightening, Half Shell, Cyclopes, Trucker, Zoo-lander, FNG (Soft Tail), Cake Boss
Cornhole Out
TClap |
11

True Americans

It’s hot outside, guys. 74 and humid at 0615 as YHC rolled up.

 

I saw a few PAX conversing and heard there were pull ups being done. How did I know that Trucker would be there talking about how many pull ups he could do? Maybe just a hunch. It was good to see a few guys starting off with a little bit of acceleration prior to the Weinke. The clock struck 0630 and YHC took the reins for the first half of the morning.

NO warmup/COP.

Short Mosey down Windward, right at Anchorage Community

Quadzilla in Anchorage Neighborhood

Down the hill to the white brick mailbox and back to the entrance x 5

Mosey back to Runde

 

Squatzilla – Parking Lot

3 space lunge walk, 10 squats. Mosey back.

6 space lunge walk, 20 squats. Mosey back.

9 space lunge walk, 30 squats. Mosey back.

12 space lunge walk, 40 squats. Mosey back.

15 space lunge walk, 50 squats. Mosey back.

 

Ass Webbs

1:4 Squats/Squat Pulses, 2:8, 3:12 and so forth to 7:28 before YHC’s 30 minute portion was up. You guys got lucky. 

 

Italian Job Takes the Helm

Mosey over to baseball field – it was at this point IJ decided to do what YHC didn’t do – bring a message. Today we were honoring Sunshine – as it was his last post prior to reporting to Parris Island by way of the Four Seasons… we as Americans are able to choose what we want to do, we can choose to sit back and mail it in, or we can bring it and push hard for this workout. Likewise, in our life we are able to sit back and coast (typically leading to much deceleration), or move forward and push ourselves to better our families and communities. So the next iteration was to honor America and Sunshine’s call to serve.

 

All American Elevens – foul pole to foul pole

True Americans / American Hammers. This one took quite some time, and was rather difficult. Thanks for the push, IJ.

 

Mosey back to parking lot

Ab Lab – 

(15 IC) Boxcutters, Flutters, Pretzel Crunch

Last two minutes: 10 Eskimo Merkins to close it out

 

What a workout! It was great being able to talk to Kaiser during most of the second half. That dude is a #HIM and always has a great insight into the Word and the world. The mumble chatter was also very pleasing today.

 

Announcements: YHC can’t remember!

Prayers/Praises:

Cash – he is self sufficient right now but it could be soon that hospice care begins. Pray for the Lord to heal him.

Sunshine is reporting for duty to the USMC next week. Pray for him as he leads through bootcamp with the principles he has picked up at F3. Pray for Funhouse and his family as they part ways – that the void not be seen as a loss but as an opportunity for Funhouse’s arrow from his quiver go out into the world and change it.

Families – that our concentrica truly knows our heart is with them. We as dads tend to be a little hard shelled in that our kids may not know how we rely on the Lord and have faith. If we can soften our hearts and allow our children in to see how much we love the Lord, it will ultimately help them in their faith.

Pray for strength for YHC, for I am but a weak man.

Unspoken prayers.

 

Trucker, thanks for the privilege to lead such a fine group of men alongside the #HIM that is Italian Job.

 

Punch List out.

TClap |
11

APFT volume 2 of 7

APFT vol 2 of 7 results:

2 mins AMRAP merkins for count, 2 mins AMRAP big boy sit ups for count, and timed 2 mile run.

Points are awarded for count/time bracketed by age group. Personal Record (PR) is for GC’s APFT’s from June thru December 2020, not necessarily PAX PR of all time. 1st attempt pax are PR

PAX, # of reps/time (scores), total points/ave points, +/- previous ave (PR?)
Maximus, 83 merkins (100), 70 bbsu (94), 13:08 (100) = 294/98.0 +2.3 PR
Gekko, 80 merkins (100), 56 bbsu (89), 14:34 (99) = 288/96 PR
Cha Ching, 92 merkins (100), 70 bbsu (93), 13:59 (95) = 288/96 PR
Dark Helmet, 79 merkins (100), 57 bbsu (85), 16:06 (83) = 268/89.3 -4
Nature Boy, 54 merkins (77), 85 bbsu (100), 13:45 (90) = 267/89 PR
Olaf, 70 merkins (95), 48 bbsu (67), 13:52 (95) = 257/85.7 +3 PR
BOT, 90 merkins (100), 50 bbsu (69), 14:53 (86) = 255/85 0
Change Order, 62 merkins (96), 57 bbsu (85), 17:28 (71) = 252/84.0 -1.7
Body Wash, 72 merkins (99), 39 bbsu (61), 14:50 (84) = 244/81.3 +4 PR
Lutefisk, 57 merkins (82), 53 bbsu (73), 16:29 (72) = 227/75.7 +6.4 PR
Falcon Crest, 52 merkins (76), 51 bbsu (71), 16:21 (73) = 220/73.3 PR
Tardy, 69 merkins (94), 52 bbsu (72), 20:12 (37) = 203/67.7 PR
Lox, 45 merkins (77), 36 bbsu (64), 19:13 (56) = 197/65.7 PR
Hacksaw, 68 merkins (96), 63 bbsu (76), 18:03 (31) = 175/58.3 PR
Shop Vac, 36 merkins (78), 12 bbsu (44), DNF (53) = 175/58.3 PR

TClap |
8

Preparedness with a Board of Pain

“Preparedness – Getting ready for the expected while BEING ready for the unexpected” – QSource

The unexpected: At anytime during the workout you hear my whistle, drop and do 20 burpees. Whistle unexpectedly went off 5 times for a total of 100 burps/pax…

The expected: BOP & 3 miles

  • 40 merkins
  • run 1/4 mi
  • 30 wide grip merks
  • run 1/4 mi
  • 20 diamond merks
  • run 1/4 mi
  • 10 derkins
  • run 1/4 mi
  • 40 squats
  • run 1/4 mi
  • 30 monkey humpers
  • run 1/4 mi
  • 20 lunges (ct one leg)
  • run 1/4 mi
  • 10 bomb jacks
  • ru 1/4 mi
  • 80 side straddle hops
  • run 1/4 mi
  • 60 lbc’s
  • run 1/4 mi
  • 40 flutters
  • run 1/4 mi
  • 20 big boys
  • run 1/4 mi

95+% HUMIDITY. AGAIN.

TClap |
5

Slow burn . . . yes really a slow burn

A great day for a slow burn and exercises with a twister.  5 present on this glorious day.

toy solder twist

Moroccan night clubs

little baby circles

inchworm – check your ego and be honest with yourself and count your number

fast feet squat

plank jacks

dead bug

low country crab

mountain climbers

reverse monkey humpers

bear taps

some mozy and stretches to finish off the 45 minutes.

prays for those who are fighting health issues

meals on wheels – change order

this country AMEN

TClap |
0

Thrill… Running!?

So Boss Hogg the fastest man in Fort Mill invited me to Q Footloose.  I hate running, but i’m slowly getting to not hate it so much now that my back is much better.

For those that don’t know, in 2015 I fell doing a mud run and royally screwed up my back.  It took years to get where I could even walk without pain, much less run.

So today I pulled a very old Q out of the bag and modified it up a bit.

We started at the beginning, a very good place to start.

Warmed up at First Baptist, and launched into Round 1

Each round includes the same exercises, but we perform them in a ladder style going up and down the rep counts.  The exercises were:

Squats
Lunges
Calf raises
Moroccan Nightclubs
LBC
Reverse crunch
Hello Dolly
Superman
Flutters

Round 1 – 5 reach
Round 2 – 10 each
Round 3 – 15 each
Round 4 – 10 each
Round 5 – 5 each

After each round we ran, yes ran to the next stop.  We stopped at the corner across from Hardee’s, then the Methodist Church, then reversed back to the corner, then back to the start.

We finished off with a round of Mary and called it a day.

Thanks for the opportunity to lead, happy birthday to Bowser (UHaul’s 2.0) and Happy Birthday America on Saturday!

The Thrill is gone!

TClap |
4

Rust removal via building pyramids

22 HIM descended upon Golden Corral, 6 of whom opted for the Fire Ant.  Prior to arrival YHC wrote out the exercises with sidewalk chalk around the grounds and was quickly reminded how rough the parking lot surfaces were around the grounds.  While it made for a few challenges to write things out, all was sketched legibly enough for the attending PAX to enjoy.   The fun was about to begin.

The boot campers ventured off with YHC around the A/O grounds.  Cabana Boy and Slow Jams were also present but YHC could not find them in the tags.  Cobains.   YHC was coming off a week of vacation and looked forward to getting back out with the PAX.  It was time to roll

Here’s what we did.

Mosey to Grace Presby parking lot for the warm up (just before the signs went up for voters).

Imperial and Hillbilly Walkers x 10 (D/C and I/C – Olaf  decided to make the exercise literal

5 burpees after each

Low slow squat x 10 holding into people’s chair after the 10th rep to do the following (all D/C and in cadence)  Morroccan night clubs x10, air press x 10 and shoulder tap x 10

Recover to standing position for 5 more burpees before 15 SSH D/C I/C and off to the Harris Teeter wall for:

Wall Sits while each PAX did 3 burpees.  Cha Ching had the best burpee form.  YHC did not.

Mosey to the back lot, into the fresh country air with accompanying humidity and the main event: Partner Pyramid Work – DORA style.

PAX paired off – 16 made for 8 teams of 2.  While Partner 1 started the pyramid, partner 2 ran to the opposite end of the lot, through the clean smelling aforementioned air, did an assigned exercise for each trip and returned to switch off, picking up exercises where the partner left off on the pyramid.

Run #1 & 5 – 10 burpees

Run #2 & 6 – 10 squats

Run #3 & 7 – 10 diamond merkins

Run #4 & 8 – 10 wide arm merkins

The pyramid was 10 lines total – 5 lines down and 5 lines back up

10 burpees

10 burpees and 20 squats

10 burpees, 20 squats and 30 merkins

10 burpees, 20 squats, 30 merkins and 40 flutters

10 burpees, 20 squats, 30 merkins, 40 flutters & 50 jump squats

50 jump squats, 40 flutters, 30 merkins, 20 squats & 10 burpees

40 flutters, 30 merkins, 20 squats & 10 burpees

30 merkins, 20 squats & 10 burpees

20 squats & 10 burpees

10 burpees

Work was done around a little mumble chatter (but just a little), PAX got better and finished just in time to mosey briskly to COT for a 1-minute geometry class.  A protractor ab exercise was completed for 60 seconds at varying degrees.  For some reason, 0 degrees was the preferred choice but we never quite got there.  At 0600, we called time and circled up for name o rama, announcements, prayers and praises

Announcements:

Convergence at WEP on 7-11

Classroom ready notebook fundraiser is in full swing and runs through the end of June.    Questions – reach out to Bonsai.

Praises were offered up and prayers were offered up for those battling addictions and for families as well.

NMM – In a time of crisis, all of us benefit from routines, disciplines and accountability – staying true to the values and standards that make us the leaders we are called to be – at home with our families, at our places of work and in our community.  In any crisis, a person can only rise to the level of their training.  As we work our way through this pandemic it is YHC’s hope for all PAX that they look around and know that no matter what they are going through, we all can use the unforeseen events of the past months as opportunity to enhance our resolve, encourage one another and to help one another accelerate in our development of all dimensions – physical, mental, professional, spiritual, the list goes on.

My thanks to Lutefisk for the call out and opportunity to Q.  It was good to get out in the gloom and accelerate with a great group of #HIM.  I’m thankful for all of you.

Honored,

Cyclops

TClap |
0