Like a Flock of Seagulls …

We ran.
Most ran past Hardee’s, some ran to Hardee’s.
Some ran all the way to Summersby & Unity.
One pre-ran the run.
17 out, 17 back.
Note to Olaf … the trees need trimming between launch and The Peach Stand.

Looks like we made it,
Barry Manilow

TClap |
0

Trucker’s worst nightmare

WARMUP: poppins led off with 20 SSH, 10 WM, 10 Merkins (IC) then some honeymooners and downward dig

THE First THANG:
3 laps around the AO with 5 pain stations each lap (1st time through do exercise 1, 2nd time through do exercise 2, 3rd time through do both exercises)

station 1)
exercise 1: 5 burpees
exercise 2: 10 star sits

station 2)
exercise 1: 5 bomb jacks
exercise 2: 15 monkey humpers

station 3)
exercise 1: 5 jump squats
exercise 2: 20 merkins

station 4)
exercise 1: 5 jump lunges
exercise 2: 25 LBCs

station 5)
exercise 1: 5 knees Tar Jar
exercise 2: 30 plank jacks

THE Second THANG:

un-BEAR-AB-le Ladder

cones at 10, 20, 30, 40, and 50 yards

bear crawl to first cone, do 10 American Hammers, crawl bear back to start

bear crawl to first cone, do 10 AH, bear crawl to second cone, do 20 shoulder taps, crawl back to start

you get idea… 30 yard mark was 30 flutters, 40 yard was 40 LBCs, 50 yard was 50 plank jacks

THE Last THANGs:
mosey to pullup bars – each PAX does 5 pullups calling up – other PAX perform merkins on the up call

Mosey to big hill and do Indian Run up and down hill while 1 PAX drops and does 2 burpees and sprints to catch line of runners.

MARY: no time

ANNOUNCEMENTS: Bethel Men’s Shelter Creole – first Thursday of August

COT: be there

TClap |
0

Soggy bottom brothers at Runde Park

WARMUP: SSH, windmills, imperial walker, m nightclubs, merkins, plank, cobra, down dog, plank, Peter Parker, Parker Peter. Mosey to Runde field.

THE THANG:   Eight stations with six yard gaps between each station. Round one all eight stations, round two complete first 7 stations. Each round skip the last station from previous round.  Travel between each station first round lunge walk, second round, bear crawl, third round broad jump, fourth round lunge walk, fifth round bear crawl.  We completed five rounds.

1. 5 burpees
2. 10 donkey kicks
3. 15 big boys
4. 20 Carolina DD
5. 25 American hammers 🇺🇸🔨
6. 30 (60) shoulder taps
7. 35 (70) flutter kicks
8. 40 (80) mountain climbers 🧗‍♂️

Hand off to cake Boss
Mosey to the bottom of the big hill. Organize into three groups of three. Lesson from Top Gun & Maverick, don’t leave your wing man. Four cones in a 1/3 mile block. First round 20 sumo squats per cone (80 sumo squats in first round).
Second round discuss with your wing men something you learned from your father. Each cone was 10 leg Lifts.
Third round we voted for burpees or donkey kicks.  The rep count wasn’t provided but we agreed on donkey kicks. Rep count was 10. Discuss w your wing men proudest moments with your father. YHC was college graduation, marriage and pregnancy.
Single file line organized from slowest to fastest man at the base of the steep hill. Game of catch me if you can. First runner gets a three tree head start and needs to top the hill before second runner. I thought the gap was too wide but almost got caught by the fastest man Fishsticks.

MARY:  none

ANNOUNCEMENTS:  Review the newsletter for more info.  Sign up and do some yard work at the Fort Mill care center. Get involved in the Bethel Mens Shelter dinner.  F3 dads is today. Coffeteria at Tega Cay Deli today. YHC needs four men to push a truck out of my backyard this morning. Thanks Mainframe, Change order, Skipper and Cake Boss for your help.

COT:  happy Father’s Day. prayers for our fathers and those whom have lost fathers.  Love your children unconditionally.

TClap |
0

A little baseball at the Burn

WARMUP: 2 Ruckers launched and a short mosey followed by a few exercises. An attempt to do a Hillbilly March followed by an Indian run.
THE THANG: A wall sit with pax rotating merkins. A ladder of jacks exercises. A few innings of baseball with pain stations as bases.
MARY: Did a burpee wave.
ANNOUNCEMENTS: Read the newsletter and get to The Yard!
COT: Lord’s Prayer and 15 seconds of silence.

TClap |
0

Break Time at Golden Corral

We started the beautiful morning with a nice mosey around the dumpsters.  Thankfully, the one in the back had the aroma we were looking for.  Oh, the memories.

Circle Up:

10 Merkins, 20 Windmills,  15 CDD, 12 Cherry Perkins, 10 Mountain Climbers, 10 Parker Peters and 10 Peter Parkers.

Mosey to the front for some circle of Abs.

Low and behold her come the Ruckers and they needed some men to help them carry their coupons.  We joined them and did some Ruck Pushups, Coupon carries with shoulder press and squats and some Burpees.  We then carried the coupons to Napa where we parted ways.

We had an AMLAPs with 10 burpees, 20 CDD, 30 Squats, 40 LBC/Hello Dolly, 30 lunges, 20 Merkins and 10 Bomb Jacks then a lap.

Once finished we mosey to COT and ended with some boats and canoes, Cha Cha Planks, Windshield Wipers and X-O’s.

Good time was had by all.

Keep the Change Orders in your prayers.

TClap |
0

For those who chose to fartsack, shame on you. For those who posted elsewhere this morning smart choice. We ran to back parking lot for a quick COP then went right into the pain. At bottom of entrance to GHMS we would run to the first light pole: 5 squats and 10 merkins; run back to starting point. Then run to next light pole and do same exercises.  Run back to starting point. Run to the next light pole, and so forth till you ran to each light pole up to Dam Road. I call is Lights to Heaven.

It sure felt like I was going to heaven with the loss of oxygen.

thanks Shower Curtain for opportunity.

TClap |
0

The Slo-burn climbed a ladder or two

14 Pax accelerated into the weekend with a workout plan that offered Jacob’s Ladder, 5 of Diamonds, and a Ladder that offered burpees, Donkey Kicks, BigBoys, BombJax, and Squats.

We began the beatdown with a slow mosey that would keep the group close together and offered up some mumble chatter on the lack of ground covered with this small lap.

The group circled up for some warm-up :

SSH, Squats, Merkins, Cherry Pickers, Moroccan Night Clubs, and some stretching.  The group quickly transitioned into two rounds of a 1-minute HIIT – 10X Merks, 10XSquats, and 10x LBCs.

After the warm-up  – we partnered up with Jacobs ladder using partner merkins and partner big boys. Each rep was completed simultaneously by each partner w a hand slap for accountability.  Partner Merkins with a mosey to another side of the parking lot for the Big Boys.

Once completed, we transitioned into a modified 7 of Diamonds, ( 5 reps was the factor)  -four corners were the destination.  ( 5, 10, 15, 20 ) Round 1 – 5 Bobby Hurleys at each corner. Round two offered 10 Merks at each corner, round three offered 15 squats at each corner.  We kept the group together by adding cadence w volunteer (voluntold) random pax leading the count.  The mode of transportation was greeted w some groans from the group.  Mosey, bear-crawl, NUR, and modified lunges took us between the 4 corners.  The Pax finished the round with Flounder taking control and offering a modified version to keep the Pax guessing…..

As time was quickly passing, the men moseyed down a slight incline to be greeted with the uphill ladder as the final round.  The ladder contained 9 squats at the bottom rung, followed by 5 burpees, 6 Donkey Kicks, 7 Big Boys, and 8 Bomb Jax.

We headed back to COT for a 5 min round of Mary to close out the day.  Shout out to Change Order for breaking out the Boat/Canoe which was greeted by a time check request and more mumble chatter (or groaning)

Prayers were offered for upcoming Graduation, travels, marriages, surgeries, and overall blessing for the group.

Nice work!!

 

 

 

 

TClap |
0

New perspectives

The theme for today was looking at things from a different perspective. That perspective was upside down nose to nose with a brick wall.

 

Disclaimer asking PAX to modify as needed – you know your limits, but also don’t be a wuss.

 

Warmup on side of HT:

20 Goofballs – increasing the pace to ludicrous speed by rep 20

10 merkins

10 moroccan night clubs

10 Carolina Dry docks

lean up against the wall and stretch the lats. I find that when doing shoulder work, warming up the shoulders and stretching the lats really helps me. Your mileage may vary

 

Part 1 – The wall

balls to the wall

10 count from PAX

shoulder taps – 5 each side

another 10 count

get off the wall

 

20 merkins

10 wall walks with a merkin

People’s chair

while holding people’s chair, leapfrog x2

Duck walks round 1 to really get after the quads

Crab walks round 2

 

Balls to the wall

10 Hand stand pushups – preferably without smashing your face on the sidewalk

optionally Carolina dry docks – know your limits here

 

Mozey to the other side of the parking lot near the Indian restaurant

 

Part 2 – The Pain

AMRAP (15 minutes)

5 burpees every minute on the minute

20 Squats

20 Lunges (10 each leg)

10 Diamond merkins

Bear crawl to other side and repeat

 

Part 3 – The calm before the storm

10ish minute AMRAP

20 Mountain climbers

20 LBCs

20 Flutters

10 Box cutters

skip to the other side

 

Part 4 – The Finisher

3 minute AMRAP – This is a sprint

10 jump squats

10 jump lunges (5 each leg)

10 wide arm merkins

sprint to other side

 

“That was sufficiently terrible” – Change Order

This took us straight into COT, where we discussed being better husbands.

TClap |
0

Official Manion WOD

THE THANG:
Manion WOD
29 squats with ruck (with sandbags when available)
1/4 mile ruck (shared sandbags) some PAX run it
7 rounds

With about 10 minutes left on the clock @PunchList led us on some much needed broga.

ANNOUNCEMENTS:
-convergence/invergence tomorrow at WEP
-AMRAP for Autism event tomorrow at Mathew’s Sport Complex

COT:
@What did led us on prayer, thank you for your visit brother!

TClap |
0