Four Corners of Fun at Golden Corral

WARMUP: 4 Plank Jacks/Merkins/Shoulder Taps/Supermans. Repeat with 8 count. Repeat with 16 count. Repeat with 32 count.
THE THANG: Four corners with four exercises (20 count each) at each corner. After exercises completed at the corner, run one full lap + 1/4 to get to the next station. Exercises grouped as “Upper”, “Lower”, “Abs”, “All”. Once completed all corners we did the warmup all over again.
MARY: Nope
ANNOUNCEMENTS: Dam to Damn Bar
COT: Grassy’s son

TClap |
0

Mystic Rhythms

WARMUP:
Slow mosey out of the park, along Windward drive, down Mariana’s Ct, back up to the Windward, and then circle up on the basketball court for COP

THE THANG:
COP (All in double count cadence):
SSHx 25, windmill x 15, CDD x 10, Squat x 20, American hammer x 20, jumping lung x 15, merkin x 10, box cutter x 15, cherry picker x 15, plank/right arm/right leg high/regular, 6″/regular/left arm/leg high/regular/6″/regular, 10 burpees OYO

Move to the middle of the parking lot, and split up the group.
Group 1: runs to the playground, and does 10 pull-ups, while group 2 does hello dolly. Flapjack
Rinse and repeat two more times with LBC’s and flutters

Mosey to the field for the Tunnel of Love (5 sets)

Mosey out of the park to the bottom of Mariana’s Ct for Jacob’s ladder. 5 reps on the hil, count 1-5 burpees at the top, run backward on reps 2 and 4. Mosey back to the wall along the concession stand in the park.

Power Square.
Assume BTTW on the concession stand wall, walk on your hands along the wall, lunge walk out to the 2nd base, bear crawl along a line parallel to the wall, lunge walk back. Rinse and repeat for a total of 3 squares.

Circle up in the field and finish off the workout with 10 minutes of Broga (Mountain Pose, Warrior I/II, Triangle, Cat/Cow, Knees to chest, Happy Baby, Corpe (aka Body Destroyer).

COT

Naked Man Moleskin
Great winter morning at Alcatraz! Love the cold temps and dry air. I can’t remember the last time Q’d a whole hour. It was nice having the full 60 minutes to make it tough, but also do something different. I took a cue from Change Order and included Broga today to mix it up a bit and cool down at the end of the workout (which we never do!)

Jiffy joined us today after an extended break from F3, but didn’t show any nice of lack of fitness. Good work, brother! We had a solid group today and everyone pushed through it to make themselves better. It’s always a pleasure to lead the fine men of F3, and I look forward to my next Q at Alcatraz.
The title of the workout is yet another Rush reference (RIP Neil Peart). Since we did yoga today, it seems to fit (a little – haha).

ANNOUNCEMENTS, PRAYERS, PRAISES:
Dam2Dam 10K coming up. Opportunities to run, ruck, or just volunteer. This is a benefit for FM schools. Read your newsletter.

Prayers and praises: Pumpkin Spice’s daughter going through treatment, ST’s son’s girlfriend’s father’s passing. Change Order’s mother-in-law with Covid. Praise for Uber’s son’s success as a student musician!

TClap |
0

KICKING OFF GOLDEN CORRAL IN 2023

WARMUP:
Circle up for windmill x 15 and SSH x 20. Form a line and do toy soldiers and arm circles on the way to an area in front of HT. Circle up again.

THE THANG:
After the disclaimer and a short warm up, we were greeted by two additional pax who joined the circle for a Tabata workout.

8 exercises, 8 reps each, 20 sec work, 10 sec rest.
The exercises we did today were:
1. CCD
2. Box cutters (tough)
3. Mountain climbers
4. Squats
5. Merkins (crowd pleaser)
6. Superman hold
7. Alternating lunges
8. Burpees
Finish with 90 sec body destroyer

COT

NAKED MAN MOLESKIN
I’ve done this workout several times and it’s very easy to plan, but a little tricky to execute. Keeping track of the exercises and the number of sets requires some concentration. With no cadence counting, it encourages a lot of mumble chatter and we had plenty of that today. Noteworthy was Slapshot, who welcomed our FNG with steady conversation for the entire workout. I tip my hat to him because while the rest of us were groaning on sets 7 and 8 of merkins, he kept the chatter going with little sign of fatigue or O2 deprivation. Well done!

Welcome Pongo who comes to us from North Charlotte (I believe). He brought along an FNG who we dubbed Gremlin. Welcome, gentlemen! Love getting FNG’s on the weekday workouts. It was a great morning with the fine gentlemen of the Fort and a pleasure to lead the group as always. Thanks for the Q nod, Slow Jams!

ANNOUNCEMENTS/PRAYERS
Dam2Dam race/fundraiser for Ft. Mill Schools in Feb. Read your newsletter.
Prayers: Buffalo Bills player Damar Hamlin, Pongo’s grandfather Warren, kids returning to school.

TClap |
0

Choose Your Own Adventure

We had a great crew if vets and rookies out at Alacatraz.  This was a choose your own adventure work out.

We started with a mosey around the park with a stop every 1/3 of the lap for warm up exercises.

1st 1/3:  15 Windmill and 15 CDD  2nd 1/3:  15 Low slow squats and 15 Cherry Pickers Final 1/3:  IW x 15 and LBC x 20

Choose you own Adventure:

Start at Playground:

4 Laps Around Park, 150 Merkins, 150 Abs, 150 Dips and 50 Pull Ups

Choose your reps and your order.

The men crushed it today and we had time for some wall time.

Mosey to the Wall:   Wall Sits while each man bear crawls 15 yards and back, Balls to the Wall with 7 Count Each Man, Rinse and repeat both.

Mosey to playground for some shirtless Broga with Change Order leading the way,

I appreciate each man that came out and gave it their all.

 

TClap |
0

Merkin 200 at the Yard

Short mosey to start
Warm-up: SSH (I/C 20x), Windmills (I/C 8x), Imperial Walker (I/C 15x), Moroccan N/C (I/C 15x), Mountain climbers (I/C 15x)
Six count burpees (5x)
Short mosey run
Routine #1: Prison Yard Merkins: at a half basketball court do 10 merkins at one corner, bearcrawl to next corner and do nine merkins, keep going around until finish with one merkin (from 10, the total merkins here is 55).
Short mosey run
At the benches:
Step ups (10 each leg, OYO)
Derkins (15, single count)
Butt Touch Squats (15x)
Incline merkins (15, single count)
Calf raises (I/C 20x)
Dips (I/C 15x)

Short mosey run to fire access road
We ran a short bit and then stopped and did a push up exercise, rinse/repeat.  Some ten counts in between.  The push ups were:
HAND RELEASE (15 single count)
WIDE ARM (15)
DIAMOND (15)
CURB RIGHT (10)
CURB LEFT (10)

Short mosey again, stopped and did:
Toy soldiers, stopped and did monkey humpers
Lunge walk, stopped and did bobby hurleys

Short mosey run
Another push-up exercise bit:
HAND RELEASE (10 single count)
WIDE ARM (10)
DIAMOND (10)
REGULAR (10)

Short mosey to last push-up-related bit:
Six count burpees (5x)

Mary: Freddies, LBC
Fini, COT
Thanks to all for joining me on the day I hit 200 F3 posts in 2022.

TClap |
0

Tabata

WARMUP:

The Motivator
THE THANG:

TABATA: 4 rounds of each
40 sec. Mercs. 10 sec. Rest
40 sec. Flutters 10 sec. Rest
2 min. Bear crawl
40 sec. Squats 10 sec. Rest
40 sec. Rowers 10 sec. Rest
2 min Mosey
40 sec. Cross Country Skier 10 sec. Rest
40 sec. Burpies 10 sec. Rest
2 min Laterals
40 sec. Shoulder taps 10 sec. Rest
40sec. Forearm planks 10sec. Rest
2 min Mosey

TClap |
0

Remembering Badger

Thirty-five of Fort Mill’s finest gathered at Springfield Elementary to honor a brother who left us too early:  Matt Giesler, aka Badger.   Matt was originally from Wisconsin but made his home in SC with his wife Becky and his three children Brayden, Ashlyn, and Carsten.   Badger was a neighbor and friend to me, Decibel, Trucker, and Jiffy, and this morning, his fellow brothers of The Fort joined us for a brisk morning workout.  Here is what we did:

The Thang:

Senator Tressel led the pax on a short lap around the drop-off lane of Springfield Elementary before ending up in the adjacent field for COP.

All in double count cadence:

SSH x 25, IW x 25, merkin x 10, windmill x 15, mountain climber x 25, Freddie Merc x 25, hello dolly x 25, squat x 25

Line up next to the set of cones:

Round 1:  Lungewalk to 1st cone, 5 squats, continue to 2nd cone, 10 squats, continue to 3rd cone, 15 squats, run backwards to the start.

Round 2:  Bear crawl to 1st cone, 5 squats, ….., run backward to the start

Round 3:  Run to the last cone, 10 burpees, and run backward to the start

Handoff to Decibel:

Do the following exercises with a lap around the field between each:

MERKINS X25
ALTERNATING LUNGES X25
TOE TAPS X25
TONY HAWK BURPEE X15
GORILLA HUMPER X20
IMPERIAL WALKER X20
EMPTY WHEELBARROW
SQUATS X20
LBCs  X39
E2K X20 EACH SIDE
ROSALITA X25

Heals to Heaven x25

COT

Naked Man Moleskin

ST’s comments:

I was truly touched by the number of men who showed up today to honor Badger.  I know that many of the men did not know him, but it meant a lot to us to have such a large group together as we remembered Badger.    It was another reminder to me of what a special thing we have at F3 here in Fort Mill and how much my F3 brothers mean to me.

Decibel’s thoughts:
It is hard to believe that it has been 4 years since Badger went to be in heaven.  I
was blessed to spend time with him prior to his passing.  We talked about him
being saved and how important that was to him.  He let me know that his M was a
big reason he was saved but also saw my family’s reaction to losing our
daughter and son and our dependence on God at that time.  I am saying this to let
you know as Christians people watch our actions and want to make sure our
actions match our words.  I encourage every Christian brother in F3 to live out
your faith and in times of need lean on God just like Badger did in his time.
My M and I received a letter from Badger.  In that letter he mentioned F3 and the
support he and his family received after the diagnosis.  I remember him just being
in awe of all the people that were praying for him.  He was so touched by this
community that he asked that I make sure that his boys get involved in F3.  They
would have been there today, but his youngest wasn’t feeling well. To have 35
men in our community support Badger is amazing.
Badger was a man I respected to the utmost.  He was not a guy that sought
attention or glory, but he was always there when you needed him.  He loved his
family and was a loyal friend.  I am still in awe of how he bravely prepared to walk
into heaven.  It was so comforting to know he was going to see Jesus.  He told
me many times that he would take care of our babies (Elizabeth Grace and
Garrett) until we met up with him.  Badger was a great Father and I know he is
having a blast with my kids in heaven.
Let us all take this time to pour into, support, love on and encourage our F3
brothers. Then take that momentum and turn it to our families.  Then take that
momentum and pour it out on the least and the lost in our community.  Badger
knew that God had a purpose for him and that purpose was to spread the word of
God’s Grace and Love.  Let’s make that happen for him.

Prayers and Praises – as spoken during COT

Announcements:  F3 The Fort 10 year anniversary starts this week.  Check Slack for the schedule of events.

 

TClap |
0

Running … into trees

It was hot and humid, first day all year as such.
We ran.
Some ran 3.4 miles.
At least one ran 5.5 miles.
At least one ran into a tree (it’s not a laughing matter)
At least one hung out by the bank and smoked Marlboro Reds (rumor has it)

Get off my lawn!

Looks like we made it,

Barry Manilow

TClap |
0

12 Cones and Chalk

AWarm Up

Mosey + Stretching

Church parking lot:

  • 6 cones for legs, 20 ct.+ modes of transport; length of lot
  • Lap
  • 6 cones for chest and core, 20 ct. + bear crawls; length of lot
  • Lap
  • 6 cones for legs, 15 ct.+ modes of transport; length of lot
  • Lap
  • 6 cones for chest and core, 15 ct. + bear crawls; length of lot
  • Prison break to COT
TClap |
0