Simon Says at the Ranch

Start with a Mosey run in Parking lot
Side shuffles
High knees
Butt kickers
Toy soldiers
George Washington was born on Feb 22nd, 1732
More mosey run

Circle up for Warm up
SSH (IC 10x)
Windmill (IC 10x)
Imperial Walker (IC 10x)
Moroccan Nightclub (IC 10x)
Low Slow Squats (IC10x)
Merkin (IC 10x)
Peter Parker (IC 10x)
Plank stretches
Downward dog
Honeymooner
More mosey run

Thang 1: Bermuda Triangle
Three cones spaced 20-30 yards apart.
Start at cone 1, do one burpee, bear crawl to next cone
Cone 2, do two burpees, bear crawl to next cone
Cone 3, do three burpees, bear crawl back to cone 1, and pick up a clothes pin from the bucket
Repeat the circuit, picking up a clothes pin for each completed circuit.

More mosey run

Thang 2: Bench work
Step ups
Incline merkins
Decline merkins
Butt touch squats
Calf raises

Thang 2: Simon says
Football training style
Do what Simon says: Shuffle left, shuffle right
Exercises
SSH
Bobby Hurleys
Mountain Climbers
OH claps
Smurf jacks
LBCs
If pax breaks with Simon, they lose a clothes pin. Change Order earned an extra clothes pin by remembering Geo. Washington’s birth date.

Simon says penalty: Pax do burpees: their count is calculated by: 20 minus number of clothes pins remaining

Mosey run to COT

Thang 3: Sally Routine
Low plank/high plank

Fini

TClap |
0

To cold to Golf

WARMUP: no warmup-run
THE THANG: To the Fort Mill Golf course and back 4.5 mile, shorter version was to downtown main street and back is 3.2 miles.
MARY: nope
ANNOUNCEMENTS: race this weekend
COT:

TClap |
0

Simple but Effective

22 Men got better today:

Run to Office Parking lot: 15 Merkins and 15 CDD

Run to Gold Hill Elementary teacher parking lot: 20 LBC and 20 Hello Dolly

Run to Gold Hill Middle teacher lot: 15 squats and 15 Lunges

Mileage ranged from 3-5.  Great job.

TClap |
0

Pre-Convergence Convergence

There were Ruckers and runners.

Barry Manilow led the runners for 5+ miles around The Fort.

The bootcampers were led first by Maximus with a SSH x Merkin combo x2 to warm up.
After a quick warm up, the weinke was
10 merkins, 10 mountain climbers (double count) at each of the 9 swings around the park. When done and waiting on the 6 to fill in, hold an Al Gore. To wrap up, starting at the bottom of the grassy hill from the parking lot, flutter kicks, then burpees at the top of the hill.

Cake Boss took second shift with playtime at the playground.
Partnering up, one partner does squats, while the other runs around the playground. Then flapjack. Next was pull ups/merkins following the same format. To wrap up, keeping the same partner, one bear crawled across the field and run back, while the other did flutters. Flap jack until 3 rounds were done.

Fogerty took us home with some 11’s and hill repeats.
At the bottom of the hill with the statue, started with 10 merkins and bombjacks. Half way up the hill, 5 burpees, then 1 squat and big boy sit-up. No burpee on the way back down the hill. Repeat until 11’s are done cutting out the burpees when you hit 5 & 6.

This was a fun 60 min bootcamp.

ANNOUNCEMENTS: Clave Boss & convergence in 12/23. Happy Birthday Walker. Tallawah is officially closed for good.

COT:

TClap |
0

78 is magic number

WARMUP: windmills, low slow squats, Moroccan nightclubs, windmills
THE THANG: jog down to elementary school loop and find a home along wall. 2 rounds of wall sits and elbow planks. 13s (since it’s Dec 13) was the main course. Bottom of hill 1 merkin, run to top of hill to pull up bars, 13 pull-ups. Back down for 2-11, you know the drill. If you couldn’t do a pull up then 3 second dead hang per pull up. Ended up with 78 pull-ups and pushups. Had time for a quick Mary of leg raises.
MARY:
ANNOUNCEMENTS: read newsletter
COT: prayers for end of semester school

TClap |
0

SLOW and BURN

13 at SlowBurn for a warm morning of some Slow and some Burn… if you did it right!

Mosey around parking lot

Warm up

  • Stretch
  • Mountain Climbers
  • Hill Billy Walkers
  • Shoulder taps

Slow – partner lines – split into groups of 3 count off within 1-2-3 or 4 (3 rounds each)

  • Bear crawl / low slow squats
  • Lunge walk / slow Freddie mercury
  • Duck walk/ slow merkins

Burn – 10,9,8….1 – with 3 second break between (lap around parking lot then plank or LBC) – Exercise then lap around the track

  • Side Stratal hops
  • Dips on curb
  • Monkey Humbers
TClap |
0

Happy BDay USMC

WARMUP: mosey/ dynamic stretch/ ssh/mtn climber/ shoulder burns
THE THANG: CDD bear crawl CDD
Wall sits while working out to in 5,3,1 burpees/ CDD to Lt Dans to CDD/mosey to railing 3 sets 15 reps dips and decline merkins/ mosey down the way for a boogie down drill instructor session. He scared Twister… more bear crawls and Lt Dans followed by Merkins.
I think this is mostly what we did but Rebel can Audit me.
MARY: start around the circle for your choice of 10 reps in cadence of any exercise
ANNOUNCEMENTS: bbq and bourbon tonight, golf in dec./ blood drive next week
COT: lots of praises and prayers.

TClap |
0