A Return To The Corral Which Is Golden

Man, it’s been a long time. It’s been a long time since coming to the Golden Corral, or as it was often referred, the Buffet of Pain but it’s also been too long since my last post. No better way to knock the rust off than by saying yes to Lutefisk’s (just rolls off the tongue) invite and Qing Golden Corral yesterday. Trying not to lower the bar that has been established, I had to ensure the Weinke was full of all your favorite buffet options. After all, we’re not mailing this one in.

24 (23 really since Fish Sticks joined us at the end after getting his brisk miles) other hard-chargers, including feisty “Shin-Guard” joined me at 0515 to review the disclaimer and conduct a little warm up jog around the parking lot, ending up at the top, furthest from HT.

Warm-up:

Wind Mills, Jump Squats, Merkins, Diamond Merkins, Side-Straddle Hops, Carolina Dry Docks

Line up facing the Teeter. Run down to the store and Nur back to our starting point. REPEAT.

2 PAX at a time, run 1/2 way to Teeter then run back. We’d get through all 24 of us but the catch is that while you’re not running, you’re doing your best Flying Squirrels. See CSPAN, we still love you.

Reminder of 2 points (which is hard to stay accountable to when you don’t post for a while):

  1. C.O.T. Integrity – Don’t be a hypocrite. Be the same man outside the C.O.T. as you are inside it.
  2. Kotters – Bring ’em back. They’ll fight you but they want to be back AND we want them back.

More details were shared but you had to be there.

The Entree: 10 reps of 10 exercises and we’re cycling through 10 times (lofty desire). After each round, we’d run 1 set of 2-tiered suicides.

10 exercises were:

Burpees, Wide-Arm Merkins, Jump Squats, Mak Tar Jai’s, Knee Tar Jai’s (modified at the sight of bloodied knees to just doubling the yet to-be mentioned Jumping Lunges), Dips, Peter Parkers, Parker Peters, Jumping Lunges, Carolina Dry Docks.

We made it through 4 rounds.

HEY, welcome to Fish Sticks.

Until Next Time,

Maximus

TClap |
4

Remember your #

Another saucy morning for the PAX at footloose.  Slight mumble chatter as YHC assessed the group.  I had a plan but could I pull it off was the question.  Gave a brief intro and disclaimer and we were off for our 5 second mosey which caught everyone off guard.  Mental preparedness is key.  We started out with…yep you guessed it Broga.  Thanks to Sasquatches excellent training I learned a few things over the last couple of years on Broga.  Threw in a few other warmup items like windmills, SSH, blah blah blah.

On to the meat and potatoes.  First order of business was to assign a number to each PAX and an exercise which went fairly well considering a bunch of dudes early in the gloom.  Kicker was if they forgot their number or exercise we’d do burpees.  I don’t think we did any surprisingly enough.

Off to our first location down by Ft. Mill COG.  Plan was to start at #1 and go through 13.  PAX with number would run up and down the stairs while rest of PAX did exercise.  Simple enough.

Imperial Walkers, Cherry Pickers, Merkins, LBC’s, Calf Raises, Carolina Dry Docks, Flutters, Squats,
Shoulder Taps, Mountain Climbers, American Hammers, Seal Jacks, Freddy Mercury.

Off to another set of stairs where we rinsed and repeated again.  Ran back to Shovel Flag for 1 more round to finish up with COT.

Thanks Beacon for the opportunity.

TClap |
1

Can I get a taxi, Uber, or Lyft?

17 men and 1 2.0 came prepared for the workout. Lots of smiling faces, not knowing what was in store for the next hour. After the disclaimer, we jogged down to the fire station and back to the parking lot.

COP
SSHs x 20
Imperial Walkers x 15
Wind Mills x 10
Plank Stretches
Merkins x 5
Plank Jacks x 10
Peter Parker x 10
Parker Peter x 10

Next, we moseyed to the field for partner exercises called Hora(Dora’s evil cousin) 2-3-4. Similar to Dora 1-2-3 except the count for each exercise was 200, 300, 400 and the movements would be a bit more complicated that simply running back and forth.

Exercise 1: 200 Merkins
Movement: Lunges to the lightpole and run back
Exercise 2: 300 Squats
Movement: Burpee broad jumps to lightpole and back
Exercise 3: 400 LBCs
Movement: Inch worm merkins to lightpole and back

Lots of grumbling and mumble chatter. The first half was complete. The baton was passed to Maximus. Good luck everyone.

In the outfield, we circled up for two sets of exercises:

10 J-Lo’s (A generational reference was made by substituting J-Lo with Barbara Streisand. I had to google her…No compare to Jenny from the block)
10 very slow flutters

Next, we partnered up with like speed for 7’s on “the Hill”. We began with Jumping Lunges (6) at the top and Caroline Dry Docks (1) at the bottom. NUR (backwards run) back up the hill and jogged to the outfield. We lined up on the chalk line for the following exercises:

5 Staggered Merkins on each side followed by a sprint to the other end of the field.
10 Jump Squats and sprint back.
10 J-Lo’s and sprint back

End of workout, mosey to COT.

Great job by all. Uber brought his 2.0 to the workout. Likes to ski, dad is Uber. We named him Lyft. He was full of energy and smiled the whole time.

TClap |
3

Badger 1 year Convergence

Thank you to our QICs of the Badger Convergence.  For those that were close with Badger and his family who was in attendance it was a blessing to see 78 strong come out in his honor.

Cyclop’s Portion of Badger Convergence

The W/O: The sets follow the dates of every March madness trip I took with badger and the 71-64 significance is the final score of the Kentucky-Wisconsin game in 2015 (our first trip) when badger’s badgers knocked off unbeaten Kentucky in the final 4.  I heard a bit about that. 😎

3 – burpees
19 – merkins
20 – squats
15 – LBCs

64 second – wall sit (people’s chair):  reflect in silence on how we leave no doubt as badger did.

3 – burpees
17 – LBC’s
20 – flutters
16 – burpees

DORA partner up – 71 burpees.  Partner 1 runs to semi trailer and back while partner 2 does burpees then switch off and repeat until 71 is reached

3 – burpees
16 – squats
20 – lunges
17 – flutters

71 seconds – balls to the wall

Reflect on leaving no doubt and what that means for each of us – then mosey to COT.

 

Change Order’s Portion of Badger Convergence

18 merkins
48 Lbc
4 burpees
9 merkins
11 side startle hops
20 freely mercury
07 merkins
39 Lbc
Run a lap in between each

Jiffy’s Portion of Badger Convergence

Headed over to the side of Parking Lot…

 

I shared the Pax my background with Badger – I joined F3 because of him.  F3 has had a meaningful impact on my life and I owe that to Badger.  I shared with the Pax how quickly things turned for Badger and encouraged them (and myself) to make sure we are using our time and resources very intentionally.

 

The workout

 

I had cones setup and the Pax did the following sequences:

  • Lunge Walk to each cone and stop and do 10 jump squats, run back
  • Bear crawl to each cone and stop and 10 merkins
  • 20 LBC’s in cadence
  • Sequence of 10 merkins, 10 plan jacks, 10 merkins, 10 plank jacks, 10 merkins, 10 plank jacks

 

  • Lunge Walk to each cone and stop and do 5 bomb jacks, run back
  • Bear crawl to each cone and stop and 10 carolina dry docks
  • 20 American Hammers in cadence
  • Sequence of 10 merkins, 10 shoulder taps, 10 merkins, 10 shoulder taps, 10 merkins, 10 shoulder taps

 

  • Lunge Walk to each cone and stop and do 10 monkey humpers bomb jacks, run back
  • Bear crawl to each cone and stop and 10 dips
  • 20 flutters in cadence
  • Sequence of 10 merkins, 10 side shoulder punches, 10 merkins, 10 shoulder punches, 10 merkins, 10 shoulder punches

 

  • Straight suicide

 

 

We then ran to the side and between a couple of islands did a Jacobs Ladder with Bomb Jacks on one side and Burpees on the other with a total of 6.

 

Great job by the Pax pushing each other and picking up the 6 at the end.

 

We headed back to the group at the end for COT.  It was an honor to serve especially in honor of Badger.

 

Trucker’s portion of Badger Convergence

Ran behind 9 rounds. Badger would have been 40 this year. So honored him with 40/4 workout. Each PAX had to do 4 rounds of 4 exercises of 40 reps with a run from 9 rounds to end of parking lot.
Merkins
Squats
LBCs
CCD

Then over to Red Bowl wall for 40 leg raises. Wall sits with 2 burpees each down the line. Repeat with 4 scorpion merkins.

Missy to oil change store. 4 PAX lined up 20 yards away while the other took 4 car tires and flipped tires to partner, return back to start. Each PAX then grabbed a tire nd did 40 shoulder presses.

Mossy to COT

 

Senator Tressels Portion of Badger Convergence

After COP, mosey to the inclined driveway by the apartment complex on Tega Cay Drive.  I gathered the group and told them that Matt was my neighbor and friend.  Our families spent time together and that Matt was active in an adult men’s soccer league.  Matt’s fight with cancer was very short and that he was gone way too soon.

 

On to the workout:

 

Jacob’s ladder, 1-7, with burpees at the top of the hill.  Plank when you are finished.

 

Walk to the grass area in front of the apartment gym and circle up for  Jack Webb’s (10/40).

 

Freddie Mercs x 20, and Hello Dolly x 20, all in cadence.

 

End with 90 seconds of the body destroyer.  As the Pax laid still and quiet,  I told them to think about how much they have, how lucky they are, and that every day is a gift.

 

Mosey  back to the Harris Teeter lot for COT

 

End.

 

Decibels Portion of Badger Convergence

 

MERKINS X25

ALTERNATING LUNGES X25

TOE TAPS X25

TONY HAWK BURPEE X15

Heals to Heaven x25

GORILLA HUMPER X20

IMPERIAL WALKER X20

EMPTY WHEELBARROW

SQUATS X20

LBCs  X39

E2K X20 EACH SIDE

ROSALITA X25

During the workout we keep 3 soccer balls moving at all time to honor Badger’s love for soccer. 

It is hard to believe that it has been a year since Badger went to be in heaven.  I was blessed to spend time with him prior to his passing.  We talked about him being saved and how important that was to him.  He let me know that his M was a big reason he was saved but also seeing my families reaction to losing our daughter and son and our dependence on God at that time.  I am saying this to let you know as Christians people watch our actions and want to make sure our actions match our words.  I encourage every Christian brother in F3 to live out your faith and in times of need lean on God just like Badger did in his time. 

My M and I received a letter from Badger.  In that letter he mentioned F3 and the support he and his family received after the diagnosis.  I remember him just being in awe of all the people that were praying for him.  He was so touched by this community that he asked that I make sure that his boys get involved in F3.  It was such a blessing to have Jeter and all the his relatives experience the convergence.  To have 78 men in our community support Badger was an emotional journey for all of us that knew him.  I had several members of his family let me know how much they appreciated the convergence and the support for Badger.  Thank you to each man that showed up!

Badger was a man I respected to the utmost.  He was not a guy that sought attention or glory, but he was always there when you needed him.  He loved his family and was a loyal friend.  I am still in awe of how he bravely prepared to walk into heaven.  It was so comforting to know he was going to see Jesus.  He told me many times that he would take care of our babies (Elizabeth Grace and Garrett) until we met up with him.  Badger was a great Father and I know he is having a blast with my kids in heaven. 

Let us all take this time to pour into, support, love on and encourage our F3 brothers. Then take that momentum and turn it to our families.  Then take that momentum and pour it out on the least and the lost in our community.  Badger knew that God had a purpose for him and that purpose was to spread the word of God’s Grace and Love.  Let’s make that happen for him.

 

 

TClap |
6

Alcatraz HIIT & Strength beatdown

Cobains on the delay. #Life

We had a hearty crew Saturday morning.  Lots of chatter in the Twittersvere for Tesh?Jekyll Q drawing Pax from across the river and inspiring Fishsticks to bring a #kotter and an #FNG.  Well done!

HIIT:

Disclaimer then we took off for a lap ’round Runde stopping for a brief painstation to let Dolly Dogwalker go by.  Must be crazy to have 14 men run up on you so we gave some space.  Pouring into the field at the open gate we started with a circle of pain and the usual suspects of exercises in cadence.  Feeling the need to keep up my portion of the HIIT on the line we went for sprint run and and nur (backward run).  70%, 80%, 90%,100%.

Moved to the next field and put partner 1 on the line and partner 2 on the wall.

  • P1: Bearcrawl to second base run to baseball fence, hop the fence then run up hill to finish with 5 bombjacks.  Down the hill, hop the fence, AYG back to line.
  • P2: Round the world squat jumps.

Repeat 3 times with P2 doing Carolina Dry Docks then Wall sits.

Hand off to Tesh for Strength.

First exercise was to max out our push pull muscles.

Pulling is first.  Circle up shoulder to shoulder.  Every other man does an about face and puts his 6 on the ground so that his shoulders are between two PAXs feet.  The standing PAX now reach down as if they are going to help a brother up, but instead, we are going to use this as a no-equipment upright row.

All PAX lift up on the Q’s command and let down on command.  Q does this until he sees around half the PAX struggling to lift.  Swap positions and repeat.  (This may sound like a rest for the guys laying down being lifted, but you still have to keep most everything engaged so it’s not.  It’s more of an isometric hold)
Pushing is next.  You can’t do much better than the merkin.  But i wanted low rep, higher volume.  So to achieve this, the sprinkler head merkin puts more load on one arm.  (It’s a typewriter merkin without swaping sides.)  So one are goes out wide and stays straight wile the other does all the pushing (4 count to 3 both sides). Then regular merkins (4 count to 10).
Do this superset 3 times.  (I modified the pushups for some other challenges, but you’ll have to ask someone that was there… blame Walker.)
Next were some grip strength, because I think almost every man lacks in this department (it’s hard to train and doesn’t give you anything sexy to show off).  Mosey to the playground for deadhangs.  Split into two groups, one does peoples chair / Al Gore while the other group deadhangs.  Four rounds of 1 min.
Mosey to parking lot for Lt Dan.  I always associate this exercise with Jekyll for some reason, and he didn’t do it so I felt obligated.  And it’s a great exercise.  Dry dock/merkin breaks after rounds 5, 7 and 9.
And finally American Hammers till time.
NMM-
Great to have Bon Jovi who is back after a couple of years and hinted at a name change.  During the course of the workout his options became clear and ultimately stayed with Bon Jovi.  smart move.
Welcome Paper Jam from Rochester New York home of Xerox.  Today is but your first day!
TClap |
3

I’m your huckleberry…

A little background for any historian looking for minutia about May of 2019…  A couple weeks ago, our very own Nasa sent out a call to all the PAX in the Twittersphere to participate with him in the “30 day ab challenge”. Something about wanting to look good for summer.  YHC decided that having having abs (yes, just the word in its plural form) would be a nice change.  Each day HURTS.  They hurt a lot more whenever the Q pulls a favorite bit of pain out of the app to share in the mornings.

When YHC noticed on the Twitty thing that there was a call to Q footloose, I very quickly volunteered (“I’m your huckleberry”), knowing that I could stack the deck in my favor for one day, and one day only… No overlap. But that doesn’t mean easy.

Warmup
Mosey up the road over to the SE lot of 1st Baptist for
15x SSH

During the set an angry and loud dog appeared. To be good neighbors we moseyed down to the other end of the lot to finish the warm up.

15x Moroccan Night Club
15x Low Slow Squat
15x Calf Raises

Mosey down to the stairs and into the little lot next to Fort Mill Church of God. There’s a very nice retaining wall there that’s great for some moderate step ups.

Everyone paired up for some fun

Partner one does the exercise, person two does the motion for about 20m up and down the lot. Switch and wait for the six before moving on. Everyone kept together very well.
Stationary, motion

  1. Step ups, Bear crawls
  2. Merkins, Toy Soldiers
  3. Lunges, High knees
  4. Pistols R, Butt kickers
  5. Pistols L, butt kickers
  6. Supermans, Bear Crawls
  7. One leg deadlift R (toe touch), Toy Soldiers
  8. One leg deadlift L (toe touch), Toy Soldiers
  9. L elbow, left knee, and right hand on the ground, right leg straight and high, hold until the other PAX gets back from -> high knees
  10. Squats, Butt kickers

We took a rest lap after the supermans and when the circuit was complete.  There looked to be enough time to try for another full circuit, but around # 8, on of the PAX noticed my nice watch, causing YHC to LOOK at said watch, realize how bright it was getting, and we ran back to COT for announcements, prayers, and praises.

TClap |
2

RPG Broga

20 Minutes of Broga and then we ran down to the green sewer light and turned into Keswick to do laps.  3 miles in all.  Wrapped up with a little Mary.

TClap |
1

Burpees at the Ballroom?

This was my 4th Q in 6 days so I am running short on ideas, and never knowing what a moderate workout is supposed to be I struggled to build the winke, but no worries I came up with something fun and it was good to see all the Pax show up and ready to work.

Warm up mosey around the parking lot and then back to circle up for some COP.  SSH, Hillbilly Walkers, Low Slow Squat, Windmill, Potato Pickers, Mountain Climbers, Peter Parker, CDD, mixed in some Downward Dog and Honeymooner.

Mosey a little to the bottom of a little hill for a round of 11s – 10 Burpees at the bottom of the hill with 1 set Jumping Lunge with a Bear Crawl up the hill.  Apparently this was a lot of Burpees for Ballroom.  Oh well live & learn.

Activity 2 was another round of 11s, no hill this time just on curb to another.  10 LBCs  Bear crawl, lunge walk, Crab walk, or what ever, 1 Mike Tyson  and so on and so on…. Let it be know that those Mike Tysons start to hurt around 6 or 7.  Finished up with a few minutes of Mary. Great work by all.

Announcements – Convergence on the 24th,  Badger work-out, next Tuesday, read your newsletter.  Prayers  for students and teachers, families.

 

TClap |
3

Respectable Q at Alcatraz

A beautiful morning at Alcatraz and the Pax began to gather for a beatdown by 2 respectable Qs with YHC and Bolt.  Circle up disclaimer was given and YHC took the 1st half and lead the group out on a warm up mosey.

COP – SSH, Hillbilly walker, Low Slow Squat, Mountain Climber, CDD, Peter Parkers, Downward to Honeymooner(x3) – Mosey to the Pull up bars

At the Pull up bars I shared how we would spend the rest of my allotted time- A few rounds of Cindy Round 1 – run to the bottom of the terrible hill then back to the pull-up bars for  5 pull-ups, 10 Merkins, 15 Dips, 20 4 count flutters.  Round 2 – Run around the park same workout. Round 3 back to the bottom of the hill and same workout.  After 3 rounds we were all sufficiently smoked and ready for Bolt to take over.

Bolt had mercy on us and we walked  back to the parking lot where he gave his instructions.  4 stations around the park Station 1 paver curls and 5 Burpees, Station 2 Jump Squats and 5 Burpees, Station 3 Bombjacks 5 Burpees, Station 4 10 Burpees, sprint back to Station 1.  Rinse and Repeat.  With the remaining time we circled up for some interesting and challenging ab work as only Bolt could bring.

To COT – Prayers requested and given.  A great morning, and a great group of PAX

TClap |
1