VQ-O-RAMA

September is VQ month at Golden Corral.  Except last minute VQ decided he wasn’t ready.  Push a brother, but not too much.  It’s ok, Lutefisk can ad-lib!  Normal disclaimer plus let PAX know we all would be on Q today.  Something they did from their VQ.  Started off with a mosey around the Teeter, circle up for a COP:
-10 windmills IC
-10 DC merkins IC
-15 imperial walkers IC
-10 tempo merkins IC
-15 morrocan NC’s IC
-10 diamond merkins IC
-line up for a modified indian run; hold plank, rear PAX bear crawl to front

Lutefisk’s Thang: SSH during the song “Tubthumping” by Chumbawumba, every “I GET KNOCKED DOWN” = burpee

Mile High’s Thang: Wall sit and one at a time sprint about 50 yards and back, various arm work whilst wall sitting

Fish Stick’s Thang: tight circle arms on shoulders, one at a time 10 count heel raises (9 PAX = 90 heal raises!)

Corn Hole’s Thang: 12 count merkin (4 down, 4 hold 6″, 4 up) x 10

Uber’s Thang: wall work behind oil change place – 10 right leg step ups, 10 left leg step ups, 10 derkins, 20 dips

38 Special’s Thang: Some kung fu stuff that was awkward and used muscles I didn’t know existed.  noice

Deacon’s Thang: high knees in place, and whenever he felt like it, yelled “DOWN” for a burpee. over and over and over and over and over

Change Order’s Thang: 2 groups, one does pull-ups on the cart rack until the other gets back. flapjack

Crab Cake’s Thang: various ground work followed by a sprint up and back

Just enough time for 9 double count crunchy frogs to end it.  COT.

TClap |
3

Fountain Or Drain

What a glorious morning! The weather was perfect. We were blessed with a few respectables and plenty of #HIMs. The fellowship was amazing and the mumble chatter was high-quality. 

The Thang:

Mosey to the next parking lot near 9 Rounds. 

COP: SSH (30x), Merkins (15x), IW (20x), WM (15x), Sumo Squats (15x), Box Cutters(15x), Dying Cockroaches(15x)

Mosey to the parking lot at Grace Presbyterian Church. 

Partner up for a round of Dora with Merkins (100x), Squats (200x) and LBCs (300x).

Mosey to the parking lot at O’Reilly’s

Two rounds of Irkins(15X), Dips (15X) and LBCs (15X)

Two rounds of Derkins(15X), Box Jumps (15X) and Heels To Heaven (15X)

Mosey to the next parking lot at Harris Teeter for suicides with burpees.

COP: LBCs (15x), Heels To Heaven (15x) and Dying Cockroaches (15x)

COT 

Moleskin: 

Given our country’s divisive climate, it is important that we remain positive. Too many people are talking and thinking negative. Negativity is a huge energy drain. Reject negativity. Be a fountain of positive energy, not a drain.

TClap |
12

Don’t poke the Q

Cars pulling in right up to the starting time.
Disclaimer and intro.
Mosey with dynamic stretching along the way.
Circle up for some warmup and a small sample of Broga.
Back to kettle bells
Did the following exercises 3 sets of each 10-15 reps each set followed by an ab exercise.
Every three exercises we would mosey and do 10 burpees ( this quieted down most poking of the Q.)
Goblet squats, figure 8s, KB Swings, single arm rows, shoulder presses, single arm curls, clean and jerk, and reverse lunges.
COT
announcements- invergence and convergence
Prayers- Airborne son leaving for US Army boot camp. God Love the USA.
Trucker- learning everyday lessons on raising kids and being a good father.
All the kids going back to school today.

Also had a good reminder and to just love your kids and not worry about always if their the top or best at something. Just show them you love them.

Backdraft out.

TClap |
3

Rugby Sprints and Ab Work Work Great Together

It was a beautiful morning in the middle of the Teeter parking lot.  10 solid upstanding young men decided to choose the harder thing and push ourselves and each other (quite literally).  With YHC on Q you knew there were going to be some sprinting involved (hey – stick with a winner).  Asked the pax to think of one person that needed help from them today.  With that – the disclaimer was stated and off we went.

The Thang:

Little baby mosey up to the Grace Presbyterian parking lot.

Active WarmUp (European Soccer Team Style) :  High Knees, Butt Kickers, Slide to the Right, Slide to the Right, Toy Soldiers, Dipping Birds, World Wide Leaders (Power Skips – Trademark), Open the Gate, Close the Gate, Long Strides.

Presto – you’re warm

Little COP for some Ab Lab – Fluttes, LBC’s with your feet on the ground, Hello Dolly’s, Fredrick Mercury’s, More Flutters, etc.

Rugby Sprints (so predictable!) x 5 with Merkins, Mountain Climbers, Peter Park’s, Parker Pete’s, LBC’s.

Walk it off to get the heart rate down.

Then run (wink, wink, nudge, nudge) it back again x 5 with more ground exercises that I don’t remember.

Ab Lab Exercises were done at this point.

Huddle up, gents!  Take a knee.

YHC asked to think of someone that needs something from us TODAY!  (Not tomorrow – Not after breakfast)  It could be anything:  Help, To Listen, Attention, Time Together, An Apology, Forgiveness.  Think of that one person who you can serve today.  Service doesn’t have to be a huge production or program – it can be a simple task for one person in your life.

Back to the beat down.

Let’s go with the extra long bear crawls – haven’t done them in a while.  Then let’s do it again.  So cool!  Any fast bears got to do some burpees while waiting for the six.  Even cooler!

More Ab Lab Exercises were done at this point.

How about some Partner/Push/Sprint/Push with a Flap Jack and a Rinse and Repeat?  People were super psyched.

Hows about we head back to the COT general area for some more Ab Lab exercises to finish ‘er up?!?  Sounds fantastic.

COT

Asked the pax to follow through today.  Reach out to the one person in their life.  M, 2.0, family member, co-worker, neighbor, someone!  That is what service can look like.  That is what male community leadership can look like.  It can be simple tasks.  Just need to do it to get the ball rolling and help spread to others.  Aye!

Read your newsletter.  Endx.

TClap |
0

Mountain trip to Dupont State Forest on August 3rd with Trail Running, Rucking and Biking options – there will be a 2nd F afterwords

3rd F

Alright we are 2 years ago we did a mountain trip to Roan Mtn. it was one of the best trips I have made with my fellow F3 brothers. After 10-16 miles we went to Daniel Boone Inn to refuel.

With this in mind I wanted to continue to do this hopefully every year. So on August 3rd we are going to do another mountain trip. This time it will be Trail Running, Biking and Rucking options.

Our destination will be DuPont State Forest. We will leave from the Newport Walmart at 6 am it is a 2 1/2 hr trip. we will either go to the Hooker Falls Access or the Lake Imaging Access. For runners we will try and get 12-18 miles in for Mountain bikers Vuvuzela has about 20-30 mile rout lined up.

 

2nd F

Afterwords will will go to Daddy D’s and refuel.

 

Make sure you bring water and something for energy do not come unprepared you will regret it. I did exactly that last time. This will be an unforgettable trip that we will try and do every year. we need to clown car to get there since there are no rental vans available.

Reach out to me if you have any questions.  I have attached links below.

Dupont State Forest Trail Map-1

https://www.tripadvisor.com/Restaurant_Review-g49206-d2069003-Reviews-Daddy_D_s_Suber_Soulfood-Hendersonville_North_Carolina.html

www.Dupontforest.com

TClap |
6

MOON-SHOT

Eight men posted at the Ranch for a moon landing anniversary themed work out. Weather was humid at 79 degrees.  A nearly full moon was visible, but mostly obscured by clouds.

Warm up
Mosey Run
SSH (IC 12x) <<Twelve reps: Twelve men have walked on the moon.
Windmill (IC 12x)
Imperial Walker (IC 12x)
Moroccan Nightclub (IC 12x)
Low Slow Squats (IC12x)
Peter Parker (IC 12x)
Plank stretches
Downward dog / Honeymooner

Apollo Elevens
250’ length of hill
Start at the bottom with one Bobby Hurley
Go up to flag pole and do ten Merkins

Saturn V Bear Crawl
Bear crawl, Indian run style for 360’ <<the height of the Saturn V rocket
Rocket has four stages; thus each PAX got through 4 iterations of the indian-run bear crawl.

Lunar Orbit
AKA Global Warming
Circle up, Side shuffle around in tree-hugger pose
Exercises called: burpees, diamond merkins, Monkey humpers, smurf jacks, CDD, standing lunges,

EAGLE
Five light poles, about 100’ apart, run and do exercises at each light pole:
E = E2K: elbow to knees [2nd loop: Imperial walkers]
A = American Hammer [alternating shoulder taps]
G = Gas Pumpers [Gorilla Humpers]
L = LBCs [Lunge, Leg Lifts]
E= Elbow Plank [Flutters]
Repeat loop

Fini, COT

Remember the 50th anniversary of the moon landing on 7/20/19.   Truly an achievement for all mankind and significant blessing by God onto the United States.

TClap |
1

TIREsome fun at Golden Corral

Gave disclaimer a few minutes early even though Dark Helmet tried to delay the start.

Moseyed over to O ‘Riley’s Auto Parts for the warm up:
SSH
Wind mill
Honeymooner / Downward Dog
Hand release merkins
More Honeymooner / Downward Dog
Mountain Climber
Even more Honeymooner / Downward Dog
LBCs

Then moved to the hill behind Quick Lube
Sprint to top of hill and jog back down
20 LBCs at bottom (repeat 4 times)

Next Pax ventured over to the field adjacent the Gold Hill YMCA.  Every time I drive by this area I am always intrigued by the tires that are sitting out there and no one seems to use them.  So I decided that we would put them to use.  Honestly I wasn’t expecting 15 guys to show up so I had to improvise on what to do until I could come up with something worse.

– had Pax split up in 4 groups (3 tires – 1 big tractor tire and 2 large truck tires)

– 3 Teams took turn rolling the tire down to the other end of the field and back will team 4 did merkins until the teams with the tires got to the end of the field and then squats until the teams returned.

– Team 4 took its turn with the tractor tire and other 3 teams did the merkins and squats

After that I came up with the bad idea that we would all line up in two lines shoulder to shoulder and lift the tractor tire overhead and pass it down the line.  Once it passed by you move to the end of the line.  We kept this going for about 30 + yards before someone almost dropped it on their head.

To finish out the workout we partnered up for a DORA
100 Burpees
200 merkins
300 squats

Needless to say doing a DORA like this at the end of the workout is a smoker.  Everyone was able to finish the merkins and then it was time to head back for COT where we arrived a few minutes early and knocked out about half the squats and a round of Mary.

It was an honor to lead and I appreciate the Pax patience as I adlibbed some of the workout trying to account for numbers.

TClap |
2

Uno – Drop Thrill Rules – At Footloose

This morning rolled around yet another sweaty July day and twelve card sharks showed up to see what YHC had to deal out.

With a Uno-inspired beatdown, that started a few months back because of something 3D came up with Tomahawk for bells, I modified and brought my own version sans bells.

Unfortunately for Destiny, I don’t always follow the rules when it comes to games but I also take feedback from the pax, to the detriment  maybe of the pax.  *cough burpees*

So similar to a game of Uno, each pax gets seven cards to start, and you play your cards similar to Uno but the card determines your exercise.  So choose wisely.  Zero is the exception, being that a zero equals ten in this game of Uno. So that, a two card is two of that exercise.

Otherwise this was the thang:

Blue = Merkins
Green = LBCs
Yellow = Squats
Red = Lunges
Skip = Run a lap
+2 = Do two of each of the four exercises
+4 = Do four of each of the four exercises
Reverse – Repeat the last exercise, but continue going the same direction around the circle.
Wild =  Perform four of each of the four exercises and next pax changes the color.

The pax decided they wanted burpees, so if you didn’t have a matching card, then you had to draw a card from the deck, the pax had to perform five burpees, and perform whatever exercise was drawn from the deck.  That wasn’t my idea, but I like it. Also, Beacon shuffled the deck, so you can blame him for the order of cards.

Unlike a true Uno, there was no winner, we were all winners.

Like with the burpees, when one pax or member of society falls short (or doesn’t have the required card in this case) it affects us all.  Sin is the same way.  Sin may be performed in private, but it will eventually effect not only yourself, your family, your community and so on.  Live each day with purpose and strive to live third.

Thanks for the opportunity to lead this morning.  I hope you got  your money’s worth.

DT out.

TClap |
1

Climbing Ladders at the Golden Corral

Golden Corral – The AO that has been revived in recent months thanks to the leadership of Lutefisk.

13 men met at the Harris Teeter parking lot in the gloom on this cloudy morning.

Started with the disclaimer and we were off.

Warm Up

  • Mosey to HT doors
  • 50 YD Bear Crawl
  • Wind Mill X 10
  • Imperial Walker X 10
  • SSH X 15
  • Merkins X 10
  • Mountain Climber X 10
  • Recover and mosey behind red bowl

Once we got behind red bowl I instructed the PAX to partner up.  Size doesn’t matter but what matters is accountability and camaraderie.  Those two things have been a huge part of my success ever since I started F3.

Activity 1

  • Partner 1 50 YD Wheelbarrow
  • 10 Merkins
  • Partner 2 50 YD Wheelbarrow
  • Run back to the beginning (Elbow plank waiting on the 6)
  • Partner 1 50  YD Wheelbarrow
  • 20 Merkins
  • Partner 2 50 YD Wheelbarrow
  • Run back to the beginning (Elbow plank waiting on the 6)

Mosey from Red Bowl to Bakers Buzzin

 

Activity 2

CLIMBING LADDERS

7 stations.  Start at number 1 then move to number 2 and then start over.  Keep climbing the ladder.  You get the gist.

  • 1st cone 10 Burpees (run to 2nd cone)
  • 2nd cone 20 Hand Slap Merkins (Bear Crawl to 3rd cone)
  • 3rd cone 30 Carolina Dry Docks  (Crab Walk to 4th cone)
  • 4th cone 40 Squats (run to 5th cone)
  • 5th cone 50 Flutters SC (Bear Crawl to 6th cone)
  • 6th cone 60 LBCS (Crab Walk to the 7th cone)
  • 7th cone 70 Shoulder taps (Run backwards to the 1st cone)

All the Pax completed 5 out of 6 rounds and one group was halfway done with the final round before we had to mosey back to COT (Fishsticks was waiting for us).  We got in just under 3 miles and around 600 calories burnt.  Excellent push by the PAX.  There was very little mumble chatter towards the end coupled with some moaning and groaning.  Big win for the QIC.

FINAL NUMBERS (Including warm ups)

  • 50 Burpees
  • 140 Merkins
  • 120 CDDS
  • 120 Squats
  • 100 Flutters
  • 60 LBC’s
  • Several Miles
  • The last group can add 10 burpees, 20 Merkins and 30 CDDs to their total

Announcements were covered.

Prayers were said for Change Order’s mother, Pothole’s truck and safe travels for Fishsticks   and his family.

Thanks for the opportunity to lead Lutefisk!

Mile High out

 

TClap |
8

7-4-17-76

13 on hand plus and FNG as YHC took the Q at Golden Corral for the first time. Thanks Lutefisk for the opportunity to lead these Men.

Arrived early to survey the expected AO. The area chosen for the Thang I have only seen used once and coudn’t recall if there were lights or not.  There were thank goodness.  Unloaded the assortment of cindys, pavers, weight, rock, and Mama Ducks garden stone.

As the PAX began rolling in was advised we had an FNG on so I beefed up the disclaimer to ensure liability was understood.  Here comes Punchlist and Wegmans fresh of a 2 mile pre run.  Wegmans was kind enough to advise he was warm and ready to rock. Good on ya men.

Mosey around the back to the HT and found an  unsmelly location and circled the PAX up for COP.

MNC x 20 Staright into 20 Little Arm Circles x20

SSH x 20   Imperial Walkers x 20 Hillbilly Walkers X 20  WindMills x 20

Mosey over to the church parking lot for The Thang.

7-4-17-76

Carried over a bit of this #Beatdown from our friend Nasa’s  smoke show the day before with  little different twist.

Complete 4 exercises in rep sets making up the date of our Independence then run a lap of roughly 200m.

Looked something like this. Revolutionary War lasted 7 years- So 7 rounds.

RND 1

7- Merkins  4 Kracken Burpees- 17-LBCs- 76- Squats

Lap around Parking lot

RND 2

7- Werkins, 4- 4x4s modified to 4 squats+4merks — 17 BBS, 76- American Hammers 2ct

Lap around parking lot

RND 3

7- CDDs, 4-2CT Jump Lunges, 17-MTN Climbers 2ct, 76 Calf Raises

Lap around parking lot

RND 4

7- GTOs, 4-Burpees, 17- Peter Parkers 2ct, 76- Hello Dollies

Lap around parking lot

RND5

7- Diamond Merks, 4- 4x4s modified 4xsqts+ 4 Merks, 17-Parker Peters 2ct

Lap Around parking lot

RND 6

7- Dips, 4-2ct Jump Lunges, 17- 2 CT Ski Abs, 76-  Fast Step ups 2 ct

Lap Around Parking lot

RND 7

7- Bent over Rows 2x, 4- Kraken Burpees, 17- Box cutters, 76 1ct Crab Cakes

Lap Around Parking Lot.

Mosey back to  COT w/ jail Break through shopping Center parking lot.

1.5 minute Plank to close it out.

COT

F3 Dads- Through July.

Convergence 0515 7-4 Bring Snacks for CAH

Prayers Praises

Traveling PAX- Interviews up coming for FNG Realtree

Safety over July 4th Holiday

Great work was done by all.

Duck Out!

 

TClap |
0