The mid-40’s Dynamic Duo Q

Thanks to Smuggler for letting two crazy mid-40’s team up like never before into the Dynamic Duo. Lots of fun and wetness out there in the gloom. We focused today on encouraging one another and pushing through (the pain). Over 50% of this workout was aimed at strengthening your core with some endurance training to finish things off.  Speaking for Old Bay and myself – we had a blast (and this was no easy workout)! We hung around for some “coffeeteria” as well afterwards. I counted the total number of burpees and it was between 65-72 depending on what you went for. Special thanks to Wild Thing for making the trip to Tega Cay and demonstrating superb burpee form.

Warm-up:

DYNAMIC STRETCHING:

Jog – 1 Min

High Knees – 30 Seconds

Butt Kickers – 30 Seconds

Toy Soldiers – 30 Seconds

Lateral Shuffles – 30 Seconds (each side)

Lateral Lunges – 10 (5 each side)

Low semi-slow Squats – 12

Alternating Forward Lunges  – 10 (5 each side)- We rotated our torsos towards the side of the leg that is in front for each movement.

Low diamond Merkins – 15 single set

Single Leg Toe touches with other leg going back – 10 (5 each side)

Peter Pointers – 10

Rolling Crucifix – 5X each side

Table Twists – 5X each side

 

THE THANG:

I talked about the Nasty 7s that I had done with Sasquatch before and at an impromptu Q at The Ranch, but decided not to do them because of wetness from the night before so I gave the option. Most decided to do a jog to each corner in the basketball court and 4 burpees at each corner. Total was 20 here. I will have to formally teach the Nasty 7 at another time.

Stacked Feet/Staggered Hands Merkin (switch every 4) – 60 secs

Banana Rolls – 120 secs – Did with coupon for 60 of those secs

Leaning Crescent Lunges with coupon – 1 min with and 1 min without

Sphinx Merkin – 60 secs max reps

Bow to Boat – 120 secs – I was nice and we did not do with a coupon 

Side Lunge and raise coupon to put on the imaginary “shelf” – 45 secs each direction

Prison Cell Burpee (boy these were fun!)- 60 secs

Side Hip Raise – 30 secs each side

High Plank to 6 inches Run (this one really stunk)- 60 secs

Superman Banana – 60 secs

Yellow rope hoppers – 60 secs

Hillbilly Walkers – 30 secs

Imperial Walkers – 30 secs

300 Secs of Abs:

Upper Circle LBCs – 30 secs each direction; 5 sec rest between each

Twisting Pistons – 30 secs

Alligator Walks  (on forearms) 60 secs;

Canoe Crunch – 30 secs

Slow LBC and Twist (Crunch and Twist) – 60 secs

Regular Plank to the end – 60 secs

Immediate transition into my partner in crime’s Q, the infamous Old Bay:

1) Bent ladder with Morning Wood on the field and Burpees at the entrance to the parking lot. Run between a burpee and the field was backwards and a side shuffle left/right to a distant cone where Morning Wood (Turkish getup) occurred and repeat. This was taxing!

2) Catch-me-if-you-can on path around fields. Exercise was Merkins/Butt-kickers.

3) 7 extra burpees

4) SSH – 15

COT: Key items: Prayers for the Ms and praise for Delta’s great news.

TClap |
1

Live in the Present and Feel the Slow Burn

Got Labor Day 2018 weekend off on the right foot with a strong group of 23 pax. Awoke to a thick, humid late summer morning and Q-drenaline got YHC to the AO early. Erected a shovel flag as I know that my friend the Site Q,  Smithers, is on IR. Heal up brother. We’ve got this one covered.

Had put out a blast into the Twitterverse that this would not be so moderate. Once Hootie rolled in with his usual 1 minute to spare, the Disclaiming began. With such a large group and many newer faces, the full-on disclaimer was explained. Then:

Mosey in front of Empire Pizza with High Knees, Butt Kicking and Toy Soldiers.

COP:

  • Seal Jacks * 25
  • 5 Burpees
  • Moroccan Night Clubs * 15
  • 4 Burpees
  • Merkins * 10
  • 3 Burpees
  • Squats * 15
  • 2 Burpees
  • Wide Arm Merkins * 10
  • 1 Burpee
  • Windmills * 15
  • Squats * 25

MOSEY back to the rear entrance to Chick Fil A for the:

THANG:

LADDER -RUN BACKWARDS UP THE HILL, 7s, MERKINS AT TOP, BOMBJACKS AT BOTTOM. 10 Counts by destiny. ROUND 2-SQUATS AT TOP, LBCs AT BOTTOM. It’s not easy to find an incline near this AO, but the running backwards up the driveway presented enough resistance. Real crowdpleaser.

THOUGHT ON PRESENCE: WHAT DISTRACTS YOU FROM BEING PRESENT? THE PAST OR THE FUTURE?

MOSEY to side of Persis Restaurant and grab some wall. People’s Chair for 3 10 counts. BTTW for a 10 count.

To the grass circle in front of Persis for  AMERICAN HAMMERS and my personal favorite, JACK WEBB.

THOUGHT ON PRESENCE: HENRY FORD SAID ”HISTORY IS MORE OR LESS BUNK. IT’S TRADITION. WE DON’T WANT TRADITION. WE WANT TO LIVE IN THE PRESENT AND THE ONLY HISTORY THAT’S WORTH A TINKER’S DAMN IS THE HISTORY WE MAKE TODAY”.  Loved this quote.

Mosey to COT. Announcements- Q School @Golden Corral in September, The Fort 6th Anniversary Invergence, September of 1000 Burpees. Prayers for our schools, Praise for Beacon for organizing The Fort Prays for FMSD.

Always a pleasure to lead and fun to meet some of the newer guys. Great interaction between some vets and newbies today. Of course, Twister’s constant stream of mumbl and chatter always keeps things lively. Thanks to Smithers for the nod.

Short Sale signing out.

TClap |
1

Footloose, Dog Petters and Gilmore

A nice cool morning at Footloose … and we launch … then a wave of cars … thanks for joining us

Mosey around the lot to let the late arrivals join the group, out the entrance and up to the lot across from the FD. Circle up. Windmill x 10, LSS x 10, Carolina DD x 10, 2 burpees OYO, Mor NC x 15, Shoulder tap x 10, Imperial walker x 10, 2 burpees OYO, OH Claps x 26, Plank jack x 10, Hillbilly walker x 10, 2 burpees OYO.

Line up for Karaoke L, Karaoke R, Power skip and burpee broad jump x 10, back and forth across the lot.

Mosey to the furniture lot on the corner downtown, plank for the 6, Makhtar N’Diayes x 10, Dog petters x 10, LBCs x 10. Line up on the wall, wall sit, 2 x burpee wave from both ends.

Mosey to the PD lot around the corner, plank for the 6, OH Clap x 21, LBCs x 10, LSS x 10.

Mosey past the start, down the hill and to the corner lot, line up, 2 lines bear crawl, 2 lines lunge walk, walk it off 2 lines, R & R all the way to the end.

Mosey across the street, divide into 4 groups, group 1, run the spiral stairs, group 2, partner plank claps, group 3 run tall stairs and back, group 4, Scorpion DD. All groups rotate through until all 4 are done.

Mosey back to the grass by First Baptist sign, Calf raises 3×10 OYO, Mahktar N’Diayes x 10, Kneetar N’Diayes x 10, Jack Webb up to 5×20, ants, ants, ants

COT

Looks like we made it,

Barry Manilow

TClap |
12

Moderate? Is that french for ‘burpee’?

With no inspiration hitting me at home, YHC decided to show up and see what the AO would speak to me today.  It was angry and made us do stupid things.

Mosey, warm up with burpee countdown between exercises.

Mosey down the hill to the playground at the elementary school where we counted off into groups and did round robins of swing crunches, LBC’s and mountain climbers twice.

Then over to the wall for some relaxing wall sits and a couple bttw.

Who doesn’t love running in circles?  Partnered up and while partner ran lap, 2nd Pax did LBC’s, WAM’s and CDD’s – flap jack at each lap.

Back over to the middle school hill for 10 bomb jacks, run up the long windy hill and 10 more at the top.

Fairly gassed at this point I heard the words ‘Jack Webb’ in the wind so we did that too.

Mosey for a close of Mary and COT.

As always, an honor to lead the men of F3.  Thanks for being there.

TClap |
5

CSPAN Send off Convergence

141 Men came to show the Respectable**CSPAN** some Respect!!

He leaves The Fort and heads north or as Dredd refers to Yankee land. Not gone forever but just up the road 600 miles to start a new chapter in life and in F3 as he will launch F3Philly.

I am not the most eloquent with my back-blasts and I am usually to the point with posting the workout, add some words and being done, however since I can’t get Italian Job to write this up and Double D challenged the PAX to think of one word to represent CSAPN, I think that is the best way to document this convergence.

Thank you CSPAN for being all of these things and more to you r brothers in the PAX. As posted on Twitter and many of these were repeated multiple times:

brother
camaraderie
commitment
confidence
connected
consistent
courageous
dedicated
empathetic
example
genuine
handsome
HIM
honorable
humble
humility
impact
influence
influencer
insightful
inspiration
integrity
investor
legend
magnanimous
model
respect
selfless
servant
shepherd
solid
squaredaway
steadfast
steady
wise

The Workout looked like this:

WWL at the Q:

  • Mosey around the lot
  • Line up; karaoke, side shuffle, high knees, butt kickers, toy solders, lungewalk, power skips
  • COP
    • SSH, squat, merkin, moroccan night club, 10 Flying squirrels
Double D at the Q:
  • Run to practice field
  • Plank sequence
  • Split into 2 groups on each sideline
  • Sprint to center and back to sideline
  • Monkey humpers x25
  • Rinse + repeat with Merkins x 25
  • CDDs x25
  • Burpees x25
Longshanks at the Q:
  • Burpees
  • Lunges
  • Inch worm Merkins
  • Maktar Ndiayes
  • Plank Jacks
  • Squats.

Dredd at the Q:

  • Prayer for CSPAN
  • Merkin/Ab Lab series
  • Truth Nuggets and Leadership development with Major Payne, Wegmans, & Drop Thrill
  • Mosey to hill behind Bob Jones Stadium
  • Prayer for CSPAN heading to F3Philly…..”CSPAN Coming”
  • More Merkin/Ab lab series

COT:

141 Count, Name O’rama, 2 FNGs (Bikini & Manzel), Skinny Jeans pray out over CSPAN and his IMPACT on men and for Sky Q’s kingdom.

TClap |
104

August 2018 – Impact Convergence

On the morning of Friday, August 3rd, 61 Men of High Impact joined Homebrew, Deacon, & Jiffy for some #Convergence work.

For this Round Robin of Pain, we separated the PAX into 3 groups and rotated to each station for 12 minutes.

Station 1 – Jiffy:

He had setup a row of 4 cones in the bank parking lot and ran the PAX through the following exercises.

  • 5 Burpees OYO
  • Straight suicides
  • Lunge walk, 10 squats at each cone
  • Bear crawl, 10 merkins at each cone
  • 15 American Hammers in cadence
  • Suicides with 3 Bomb Jacks at each cone
  • Broad jump to each cone, 5 lunges each leg
  • Crab walk, 5 diamond merkins at each cone
  • 15 LBC’s in cadence

Station 2 – Deacon:

Find a partner

One partner runs to Pizza Hut and back while the other does a series of exercises until the team does merkins (100x), Squats (200x), LBCs (300x).

  • Partner Drills (Round 1) – Partner Big Boy Sit Ups (15x for 2 rounds), Partners Push Ups (15x for 2 rounds), Partner Leg Lifts (15x for 2 rounds)
  • Partner Drills (Round 2 if time permits) – Partner Wheel Barrels to each side of the parking lot (2x for 2 rounds), Partner Ski Jumps (15x for 2 rounds)

Station 3 – Homebrew:

4 Corners and Burpee Roll

PAX were divided into four groups, with one group being sent to each corner. Complete all exercises listed at your corner then bear crawl to the center. At the center was a large foam die. One PAX would roll the die for the group to determine how may burpees everyone would do. Amazingly, only one 6 was rolled all morning – I’m lookin at you IceT. Once the burpees were completed, crab walk from the center to the next corner going clockwise. Rinse and repeat until all corners are done or time runs out.

  • Corner 1
    • 40 SSH
    • 40 Plank Jacks
    • 40 Mountain Climbers
    • 20 Crab Cakes
  • Corner 2
    • 15 Merkins
    • 30 CDD
    • 15 Wide Arm Merkins
    • 5 Kraken Burpees
  • Corner 3
    • 10 Donkey Kicks
    • 50 Calf Raises
    • 40 Monkey Humpers
    • 20 Lunges
  • Corner 4
    • 10 Big Boy Situps
    • 20 Hello Dollys
    • 30 Dying Cockroaches (double count)
    • 10 Boxcutters

There were prayer requests for family, school returning and those with health needs.

Cakeboss took us out in prayer.

Great job, Homebrew, Deacon, & Jiffy!

– Ginsu

TClap |
2

Barney Fife’s Ballroom VQ

The Message:

Since this was my VQ I was not overly confident and could feel the butterflies doing side straddle hops in my stomach. I had made a homemade deck of workout cards that I was looking forward to trying out. However, the best-laid plans of mice and men often go awry and my plan quickly fell apart. I am ashamed to admit that I underestimated my fellow PAX. My plan was based on a group of what I assumed would be 5 – 10 that would eventually draw 5 cards each by the end of the workout at which time we would compare hands for a modified game of poker.

As I stood in the gloom waiting to give my first disclaimer I was pleasantly surprised to watch the steady stream of vehicles arrive, one after the other. By the time 5:15 rolled around there was a total of 26 of us and I was less nervous and could feel the support in the air. I quickly realized that I would have to modify my plan but I was happy to do it because no matter what happened I knew I was among good friends that would be quick to help if necessary.

After stumbling over a barely adequate disclaimer we started with a CoP warmup:

  • Windmills
  • Side straddle hops
  • Hillbilly walkers
  • Carolina dry docks

After the warm up it was time for a short mosey to the football field.

The THANG:

The PAX lined up on the goal line and planked while one person at a time sprinted to the 40 yard line, drew a card and brought it back and called their exercise out in cadence. After each PAX brought one card back for a random beat down that worked the legs, arms and abs we split up into 5 groups on the field. Each group used the 5 workout cards that they had drawn from the pile and moved to the next group of cards when they were done. After each group worked through all 5 sets of cards we lined up on the 40 yard line for more sprints:

  • 10 yard sprint, imperial walkers back
  • 20 yard sprint, power skip back
  • 30 yard sprint, hillbilly walkers back

We moseyed back to the parking lot for CoT where I explained to the group what an enormous impact my F3 brothers have had on my life since I began coming in April and we all welcomed FNG Flyby to the family.

Thanks to Short Sale for giving me the opportunity to Q, I thoroughly enjoyed it and promise to make it SUCK more next time. Thanks to all the PAX who came out and showed their support.

TClap |
3

Light Pole Work

For what looked to be a rainy morning the night before, I was pleased to see we would have a dry morning, except for the sweat from the less than moderate work I had planned.  Ballroom is a great AO and is also moderate.  The workout allowed everyone the opportunity to push themselves.  As cars rolled in a great group of 25 PAX assembled and the mumble-chatter started immediately.  After a short disclaimer we moseyed around the parking lot and stopped at the far side for warm-up

  • SSH
  • Windmill
  • Imperial Walker
  • Low Slow Squat
  • Merkin
  • Mountain Climber
  • MNC – correct arm movement

Mosey to the entrance road for the light pole work to begin.  Begin at 1st light pole with exercise, run to the 2nd and complete exercise.  Come back to 1st and complete exercise and go to 2nd then 3rd and then back to 1st.  Continue this until complete all 5 light poles. (Mumble-chatter had dropped to a low level), catching your breath was more important.  Light poles were spaced out along front entrance and every other pole had designated exercise.  Exercises:

  1. 10 Merkins
  2. 15 CDD
  3. 20 Dips
  4. 25 Monkey Humpers
  5. 30 Squats

Once completed and six was in we moseyed to the grass/mud hill on the side of the school.  Set out for a series of 12’s.  Bottom of hill dips and the top of the hill squats. 1 at bottom & 11 at top of hill – 2/10, 3/9…..

Moseyed back to front parking lot for a little Mary.  Opportunity for some of the Pax that had not Q’d before to lead an exercise of Mary.  Good job Arrowhead, Dungaree and Wide Right.

Moleskin:

We have almost completed 60 days of focus on impact.  I shared with the group that as I have thought about impact in my life, I have thought about the people in my life that have impacted me.  Most of the time they probably didn’t know the impact they made but more importantly their impact was made by how they lived their life.  As I shared that in our family, work, social and community, it may not be the words we speak but the daily actions we live that can impact someone.  I also shared Dabo’s response he had at the ACC media day, when asked about his faith.  “If there is hope in the future, there is power in the present”.  Take 3 minutes and watch the video of his response.  We are all blessed and have different opportunities in the present.  Let your actions speak loudly!!

Thanks Short Sale for the opportunity to Q.

TClap |
2

The Captain and the 1st Mate

11 Pax met at Runde Park to get their Saturday started right.    Leading the group today was one of the Fort’s youngest Q’s (Offspring) and one of the oldest (YHC).  Here is what we did:

The Thang:

Offspring on Q:

Take a lap around the park and circle up in the field by the front ot for COP:

All in Cadence:

SSHx30, IWx10, Morrocan nightclub x 20, merkin x 10/hold/shoulder tap x 10, Freddie Merc x 10, flutter x 10.

Take a short mosey to the front lot and rinse and repeat COP with more reps and LBC’s thrown in:  SSH x 50, Morrocan nightclub x 30, merkin x 20, shoulder tap x 20, Freddie Merc x 20, flutter x 20.  Complete 20 LBC’s in between each of the above exercises.

Mosey back to the field for Jack Webb.  The Pax completed 7:28 today.  The new Q was mindful of time and handed the Q off precisely at 7am.

Hand off to Senator Tressel

Pull up  the shovel flag, head up Windward Lane,  and replant it on the lake shore at Pitcairn Park.

Mosey to the lower lot at the base of the staircase and pair up.

Wheelbarrow up the first staircase, across the upper parking lot, and up the second staircase to the pavilion.  Flapjack,  rinse and repeat.

At the Pavillion, split into two groups.  Group 1 does 20 step ups while group 2 does people’s chair.  Flapjack.

Mosey back to the lower lot and down to the lake shore.  Remove your shoes and (if you like) your shirt.  Line up in the shallow water.  Start running in place and drop to the lake when the Q says down.  Rinse and repeat 4 or 5 times.

Swim out to the floating dock, find a spot on the edge and hang onto it:  20 pull-ups in cadence.

Keep holding onto the edge of the dock and then, on the Q’s command, pull yourself up and on the top of the dock.  Jump back into the lake.  Rinse and repeat 3 times and swim back to shore.

Take a minute to snap a few pictures, then pick up the flag and head back to Runde for COT.

Naked Man Moleskin:

Offspring and I were last-minute Q subs this Saturday.   Offspring is just 19.   I remember when  Funhouse brought him to his first F3 workout a few years ago,  and we gave him that classic name.  How cool it was to have him as my co-Q today,  and nice to see Funhouse and brother Brick there to support him.  Great job today, Offspring!

The decision to go to the lake was made late last night,  and my half of the workout was thrown together at about 5:45 this morning.   It’s not how I like to do it, but it’s been about a year since we’ve been to the lake,  and I couldn’t resist making the trek to Pitcairn.   Workouts at the lake are not always the best, but they sure are fun. Plus, being able to pull yourself out of water and onto a boat or dock is a life skill you’ll be happy to have when the need arises.  Technique is just as important as strength.

Some Alcatraz regulars from long ago joined us today. Aquaman was in town this week and it was fitting that he was in attendance on lake day.  Minuteman, absent for several months, also posted today.    Awesome to see you guys and we miss you!   I was also very happy to see Stallion again and hope he continues to post regularly.

As F3 The Fort closes in on our 6th year anniversary, the friendships and the fellowship among our local Fort Pax remain as strong as ever.  This past Thursday, a large group met at a local brewpub to support Cable Guy who recently lost his brother.  I was the last guy to get there and when I arrived, the Pax gave me a rousing welcome.  I felt like Norm at Cheers.   Cable Guy and YHC were the last ones there and we had a good talk.   This morning after the workout, Decibel (who was not at Alcatraz) called and asked where the coffeteria was at.   He, along with Minuteman, Aquaman,  and myself, drove out of our way to meet the WEP boys (Twister and Geronimo) at Panera for a solid 2nd F.    There are a lot of other examples of how our Pax have supported each other lately, and it’s  awesome to have that network of guys who care for one another.   More than a workout indeed!

Announcements/Prayers and Praises

1st F and 3rd F convergence this Friday, August 3 at Harris Teeter near Baxter.  3rd F discussion on IMPACT.

Children’s Attention Home meets every other Friday at 7pm in Rock Hill.  G-Fit meets at 7pm every Friday in the Fort Mill Paradise neighborhood.  If you have not attended these F3 outreach AO’s, come on out and check them out.

Prayers/praises for the Change Order’s co-worker’s son recovering from Leukemia and returning home. Prayers for F3 brother Elmer who is battling Leukemia.  Prayers for Cable Guy and his family after the death of his brother.  Praise for Minute Man whose mom is relocating to Fort Mill.

 

 

 

TClap |
4

Bing- GQ in The Fort – Alcatraz AO

Reposting with Link to Bing’s BB from F3 Suncoast.

Bing- GQ in The Fort – Alcatraz AO

The PAX

Weather – upper 60s- with a chill in the air for this Floridian!

As the pax began to roll into the AO, including a number of them who chose to take a pre-run, YHC was giddy with excitement.  It felt like good old times with so many familiar faces!

As the clock struck 6:30, the disclaimer was shared along with the 5 core principles  and off we went for a mozi around the park.  Mozi included butt kickers, high knees, Carioca x2 and a quick pace to finish the run.  Without hesitation, it was time to hit the dewy fresh cut grass for COP.

COP was delivered in a speed round, where the Q calls out an exercise and is immediately followed by the first Pax member calling out SSH x10 IC.  The COP went as follows:

  • Merkins x10IC
  • SSH x10IC
  • Windmills x10IC
  • SSH x10IC
  • Imperial Walkers x10IC
  • SSH x10IC
  • Mountain Climbers x10IC
  • SSH x10IC
  • Peter Parkers x10IC
  • SSH x10IC

It was time to get to business.  The intent of the beatdown was to share some of the Pax favorites from my new  region, F3 Suncoast. First up was, FUN WITH ANIMALS.  Cones were set up roughly 15 feet from the starting point and the pax had to do the following mode of transportation x2:

  • Bear Crawl
  • Duck Walk
  • Crab Walk
  • Crawl Bear
  • Frog Hop
  • It was obvious that the pax was having such a great time, we rinsed and repeated, with only 1 time each the second round.

After we had enough fun with animals, a quick mozi was done and the pax ended up at the bottom of the hill on Tara Tea Drive for a round of Jacobs Ladder.  Run up to the top of the hill for 1 Burpee, run back down and immediately return to the top for 2 burpess.  Rinse and repeat until you have done 7 burpees.  Plank at the top until the entire pax is complete.  This was no easy feat for this Floridian flatlander, but clearly was a crowd favorite.

After the six was in, it was time for some Mike Tysons along the curb.  Due to the size of the Pax, half of the group ran laps until the first group was done doing Mike Tysons x10.  We did two rounds and it was back to the fields of Alcatraz for the grande finale…and grand it was.

Ripken Suicides

As done at any Ripken Q at F3 Suncoast, it was time for Ripken Suicides (or as Longshanks called them initially – Cupcakes because Suicides isn’t sensitive enough).  The pax had 1 minute to complete a full round of suicides, with the next round starting after the first minute.  The faster you get done, the most rest.  This is done for 10 rounds, as long as you are able to get the suicides done in 60 seconds.  There wasn’t a lot of love shown for Ripken after this finale!  Thanks Ripken!!

With 3 minutes remaining, it was time for a quick round of mary including LBCs, Protractor and one other.

Round of Mary

 

The MoleSkin:

YHC encouraged the pax to not hestitate to disrupt their status quo.  To make sure they are not remaining in their comfort zone.  Roughly 2 years ago today, the Kelly family entirely disrupted their status quo, having no idea why the chose to leave such a great community, pax and soccer family to head to a place where we knew NO ONE.  Not long after arriving in Florida, the status quo was disrupted AGAIN with YHC taking an entirely new job and quitting the one he moved to Florida for initially.  This opportunity has been a true blessing as YHC no longer travels for work and is home with the family and available to apply more time to launching a new region for F3.  The Pax of F3 The Fort and surrounding areas have been instrumental in disrupting the lives of over 225 men in the Sarasota area, as it was because of them YHC had the confidence to move and then start a new region.  I am honored and humbled to be a part of F3 The Fort and to give away all that I have gained to my new region in F3 Suncoast.

Prayers/Praises:

  • For Cable Guy and his family
  • James, friend of YHC battling cancer for the 3rd time at 9 years old
  • Many other prayer requests spoken

Announcements:

  • Coffeeteria at Panera Bread – Thanks for hanging out, I had a great time
  • CAH – Join us
  • Welcome to Skyline – You did a great job in a not so friendly FNG beatdown!
  • Wow, I am really bad at all of the announcements as I am not with this pax daily!

Thank you for this great opportunity and I look forward to seeing everyone on Monday at Honey Badger.

Aye – Bing

TClap |
0